Finkelstein defined levels 0 (foolish), −1 (stupid) and −2 (lunatic). Schorsch changed the names and added level −3. Piney's structure, truer to the original, uses the terms incompetent, obstructive, antagonistic and psychotic.
The organization pays lip service, often with excessive fanfare, to implementing engineering processes, but lacks the will to carry through the necessary effort. Whereas CMM level 1 assumes eventual success in producing work, CIMM level 0 organizations generally fail to produce any product, or do so by abandoning regular procedures in favor of crash programs.
Processes, however inappropriate and ineffective, are implemented with rigor and tend to obstruct work. Adherence to process is the measure of success in a level −1 organization. Any actual creation of viable product is incidental. The quality of any product is not assessed, presumably on the assumption that such assessment is unnecessary since if the proper process is followed, high quality is guaranteed. This is the most common level achieved by most organizations that pursue CMM ratings.
However, level −1 organizations believe fervently in following defined procedures, but lacking the will to measure the effectiveness of the procedures they rarely succeed at their basic task of creating work. This behavior is inherent in the CMMI evaluation process. Since many government agencies will only award contracts over a certain monetary value to organizations that can pass a CMMI-3 or higher SCAMPI appraisal, management may be willing to accept inefficiencies to win these lucrative contracts. Government contracting models in which organizations are paid not for the value of their products but by the number of hours spent building them reward organizations for performing non-value-added activities related to CMMI compliance. Thus, government contractors with CMMI ratings may be more profitable than non-CMMI rated companies regardless of the quality of the work they produce.
The organization's ineffectiveness has become apparent to the marketplace or the larger organization, which ignores or attempts to neutralize these unfavorable perceptions. Measurements are fudged to make the organization look good. Measures of activity (bugs fixed, lines of code written, hours worked) replace measures of productivity (% functions completed, test success rates). Volatility in specifications and schedules is recast as evidence of organizational "agility". Certifications on "best processes" are presented as evidence that the organization is performing optimally; poor results are blamed on factors outside the organization's control. The processes chosen typically omit or shortcut essential components of recognized methods (e.g. "6-week Six-Sigma" or "Lean CMM"), which are flexible and can cover both good and bad practices. The organization becomes committed to ineffective processes, leading to a feedback cycle of increasing disorganization.
Undermining organizations routinely work to downplay and sabotage the efforts of rival organizations, especially those successfully implementing processes common to CMM level 2 and higher. This behavior may involve competing for scarce resources, drawing those resources from more effective departments or organizations.
T. Schorsch, "The Capability Im-Maturity Model (CIMM)", U.S. Air Force (CrossTalk Magazine), 1996. ↩
A. Finkelstein, A Software Process Immaturity Model, SIGSOFT Software Engineering Notes, 1992. http://www.cs.ucl.ac.uk/staff/A.Finkelstein/papers/immaturity.pdf ↩
Piney, Kik (c. 2009). "A Project Management Immaturity Model" (PDF). PROject-beneFITS.com. http://zo-d.com/blog/Project_Management_-_Immaturity_Model_v3.pdf ↩