Marianne Hammerton (1986). Water South Australia: A history of the Engineering and Water Supply Department. Wakefield Press. ISBN 1-86254-009-8. 1-86254-009-8
Strathearn, Peri (22 November 2019). "Palmer solar farm plans double in size". The Murray Valley Standard. Retrieved 5 July 2021. https://www.murrayvalleystandard.com.au/story/6506398/palmer-solar-farm-plans-double-in-size/#slide=0
"Development Application–Section 49 (Crown Development) for Solar PV installation in connection to Mannum to Adelaide Pipeline Pumping Station No.3" (PDF). Application on notification - crown development. State Commission Assessment Panel. 3 December 2019. Retrieved 4 July 2021. https://saplanningportal.sa.gov.au/__data/assets/pdf_file/0010/607726/DA_711_V030_19_-_SA_Water.pdf