The Level Crossing Removal Project (LXRP) is an infrastructure upgrade project by the Government of Victoria, Australia, to remove and grade-separate 110 level crossings and to rebuild 51 railway stations on the metropolitan and regional rail network of the state capital Melbourne. The project aims to improve network efficiency, rail safety, and reduce traffic congestion.

After pledging the removal of 50 level crossings at the 2014 Victorian state election, the Andrews Government committed $2.4 billion in the 2015–2016 budget to remove the first 20 crossings by 2018. The next 30 crossings were notionally funded through the hypothecation of the sale proceeds from the privatisation of the Port of Melbourne. Prior to the 2018 state election, the government committed to remove a further 25 level crossings, using a new prioritisation framework. In 2021, the government announced a further ten level crossing removals and four level crossing closures would occur by 2025, bringing the total planned level crossing removals to 85 by 2025. In 2022, the Andrews government announced the removal of an additional 25 level crossings by 2030, bringing the total to 110.

Previously its own administrative agency, in 2019 the LXRP became a project within the Major Transport Infrastructure Authority, an office of the Victorian Department of Transport and Planning. As of March 2025, 85 crossings have been removed and 48 train stations have been built or rebuilt as part of the project.

Background

When Melbourne's rail network was built, many road-railway crossings were via level crossing rather than bridges or underpasses due to the city's flat topography and sparse population. As traffic levels increased, these became bottlenecks for road and rail traffic, limiting the speed and frequency of train services. In 1954, the State Government established a committee to look at the removal of level crossings at Clifton Hill, Elsternwick, Footscray, Moorabbin, and Newport.78 These projects were completed by 1960.9

In 1983, the level crossing at Station Street, Box Hill, was removed. Other level crossing removals include Dorset Road, Boronia, in 1998 and Middleborough Road, Laburnum, in 2007.10 In the early 2010s, level crossings were removed at Nunawading (2010), Springvale (2014), Sunshine (2014) and Mitcham (2014).111213

As of 2014, there were 176 level crossings left on metropolitan Melbourne's rail network (4 of which involved tram lines) and 228 places where railways had been separated from roads;14 by the end of the Level Crossing Removal Project (LXRP), 66 level crossings will remain.15 Over two-thirds of these grade separations were constructed between 1863 and 1918, with fewer than one level crossing removal per year between 1918 and 2015. The commitment by the government to remove 110 level crossings over sixteen years, by 2030, represents the fastest rate of crossing removals in Melbourne's history.16

History

2014 election commitments

In June 2014, five months prior to the Victorian state election, VicRoads compiled a report of the most dangerous level crossings in Victoria and handed it to the Napthine Liberal-Nationals government.17 In its 2014 state election manifesto, the then Labor opposition announced that, if elected, it would remove 50 level crossings by grade separation, with 20 to be removed by 2018. Although the majority of crossings announced by Opposition Leader Daniel Andrews were included in the priority list, ten of the crossings highlighted by VicRoads were not on the opposition's list.18 The sites of all 50 level crossing removals were progressively announced over the following two years after the election of the Andrews government in November 2014.19

In September 2016, the Port of Melbourne lease concluded, providing $9.7 billion for infrastructure, including funding for the remaining 30 level crossing removals to be completed by mid-2022.20

2018 election commitments

In October 2018, the LXRP surpassed the State Government's 2014 election commitment of removing 20 level crossings by 2018, having officially removed 29 crossings.21 In the lead up to the 2018 state election, Victorian Premier Daniel Andrews pledged to remove a further 25 level crossings across Melbourne at a cost of $6.6 billion by 2025. The locations of the additional removals were announced progressively over the course of 2018 through a new prioritisation framework based on safety, congestion, and proximity to emergency services.22

2021 additional commitments

In July 2021, the State Government announced the removal of an additional ten level crossings and four closures by the end of 2025 at a cost of $2.5 billion.23 These removals will include the reconstruction of five stations across the network, with stations to be rebuilt at Croydon, Keon Park, Narre Warren, Parkdale, and Ringwood East. At the conclusion of these additional 35 removals, the Pakenham, Cranbourne, and Lilydale lines will have no road level crossings for their entire length, with these announcements pushing the number of crossing removals to 85 by 2025.24

2022 election commitments

These opening dates and removal methods were announced prior to the 2022 election. As these dates and methods change on a regular basis, for updated specifics, visit the list of crossing removals below.

In the lead up to the 2022 state election, the Andrews government announced a further 25 level crossing removals, bringing the total number of removals to 110 by 2030. Many of these removals will be delivered together and include a number of closures. In September 2022, the premier announced eight crossings would be removed in Brunswick on the Upfield line.2526 The eight crossings would be removed by 2027 (later revised to 2030) and would include the rebuilding of Jewell, Brunswick, and Anstey stations.27 The government announced elevated rail would be built along the corridor from Royal Park to Moreland Road, meeting the elevated rail built as part of the 2022 level crossing removal works, and would include an upgrade of the Upfield Bike Path.28

In October 2022, the government committed to removing an extra four level crossings on the Ballarat line between Caroline Springs and Melton stations by 2028. Proposed removal methods for the level crossings at Exford Road and Coburns Road is by constructing a rail trench (since revised to a rail bridge) and lowering Melton station, while the roads will be elevated over tracks to get rid of the Hopkins Road and Ferris Road level crossings.29 Seven more crossing removals and two closures were announced in October 2022 for the Frankston line.30 These level crossings would be removed by 2029 and would make the line level crossing free for its entire length.31 Four stations will be rebuilt as part of the removals at Highett, Mordialloc, Aspendale and Seaford.32

On 21 and 25 October 2022, the Andrews government announced an additional two level crossing removals for the Sunbury line and one on the Hurstbridge line. These crossings are located at Old Calder Highway and Watsons Road, Diggers Rest, and Ruthven St, Macleod. These crossings will be removed by 2026 via the construction of a road bridge for the Sunbury line removals and a rail bridge for the Hurstbridge line.33 At the conclusion of these removals, the Sunbury line will be fully level crossing free.34

The government announced an additional three removals and two closures on the Werribee line on 27 October 2022.3536 Along with the four already removed on the Werribee line, these removals would make the line level crossing free by 2030, and allow for additional services and the construction of the Geelong Fast Rail project.37 The crossings at Hudsons Road, Spotswood, Maddox Road, Newport, and Maidstone Street, Altona. These crossings will be removed with a combination of rail over and road over, and will include a newly elevated Spotswood station.38 The crossings at Anderson Street, Yarraville, and Champion Road, Newport will be closed during the project. Pedestrian links will still remain with a plan to upgrade local roads to accommodate the closure of these crossings.39

Governance

The Level Crossing Removal Authority (LXRA) was formed in May 2015 as an administrative office of the then-new Department of Economic Development, Jobs, Transport and Resources to deliver the project.404142

Later, the LXRA led delivery of other rail projects, including extension of the South Morang line to Mernda, upgrades of the Hurstbridge and Cranbourne lines, as well as a rebuilt Frankston station. The authority also delivered a new stabling facility north of Wyndham Vale station and train storage at Kananook.4344

The LXRA was abolished as an independent administrative office following the 2018 state election, and its functions were absorbed into the newly formed Major Transport Infrastructure Authority at the Department of Transport.45

Architecture and urban design

The LXRP has used several different design approaches to removing level crossings, tailoring designs to different urban settings around Melbourne.46 Most projects, particularly those in the denser inner- and middle-suburbs, have involved lowering the rail line into a trench or elevating the rail line above the road. Some projects in outer suburbs, such as Gap Road near Sunbury station or Station Street near Beaconsfield station, have involved lowering or raising the road without altering the existing rail corridor. This is enabled by the additional space surrounding the railway line.47

As noted by University of Melbourne researchers in 2016, the scale of the project had significant urban renewal implications for the city:

Each crossing removal affects, on average, at least a kilometre of rail corridor and, within the urban area, this usually includes a station. In some instances, topography has required the removal of more than one crossing to meet rail engineering requirements as well as longer sections of corridor becoming part of the works. On the face of it, this means that the current seventy-five crossing removals could result in seventy-five kilometres of transformed rail corridors and fifty-seven new stations – more than a quarter of Melbourne’s total.48

The researchers emphasised the urban benefits from new elevated rail over trenched rail, including the creation of new parkland and open space, arguing wider benefits could be achieved beyond reducing traffic congestion.49 One study examined the local public health positive and negative impacts from the removal of level crossings on the Upfield line, including significant construction impacts.50 The study found that by improving road connections the project could help induce more car usage, but that this could be offset by improving pedestrian and cycling connections.51

Awards

The LXRP has received numerous awards for their different projects in the categories of sustainability, architecture, and urban design. The Reservoir station project was presented the 'Special Prize Exterior' award in the Passenger Stations category at the World Architecture and Design Award at the 2021 Prix Versailles.5253 The Toorak Road level crossing removal topped the infrastructure category of the Australian Institute of Landscape Architects awards due to the design of the new public parkland, cycling paths, and open space.54 The elevated rail project from Moreland to Coburg stations saw landscape architects Tract win the Infrastructure Award of Excellence for their landscape and urban design work on the project, with the judging panel "particularly impressed with the urban renewal of the area".5556 The Bell to Moreland project was also awarded a score of 98 points from the Infrastructure Sustainability Council (ISC), the highest rating ever awarded in Australia.57

Elevated rail

Some of the most significant changes to Melbourne's urban structure from the LXRP have resulted from the construction of large sections of elevated rail, something that was relatively rare in Melbourne.58 In 2016, the government announced that 8.3 kilometres (5.2 mi) of elevated rail would be built in Melbourne's south-eastern suburbs to remove nine level crossings on the Pakenham and Cranbourne rail corridor and build five new elevated stations at Carnegie, Murrumbeena, Hughesdale, Clayton and Noble Park.59

Dubbed "sky rail" by opponents and some media outlets, the LXRP spurred significant local opposition due to concerns over visual and noise impacts, and lack of consultation.6061 The project became a political issue in the 2018 state election, although one opinion poll commissioned by The Age newspaper found 60% of Victorians supported the use of elevated rail to remove level crossings, and the government was returned at the election with an increased majority.6263 Prior to the election, the government announced more sections of elevated rail on the Pakenham line.64

Some experts argued elevated rail offered a better urban outcome than trenched rail, providing opportunities for more open space, economic development, better local connections and less disruption from construction.6566 The Caulfield to Dandenong level crossing removals created a large new section of open parkland, dubbed a "linear park".67 This included 22.5 hectares (56 acres) of new open space, sports courts, playgrounds, new walking and cycling trails, and expanded station forecourts.6869 As part of the project, the Djerring Trail was created, a 17-kilometre (11 mi) shared-use path along the rail corridor. In the year after the elevated rail opened in 2018, the media reported that many residents, including some who were opposed to the project, were happy with the outcome and utilised the new open space.7071

Tree removal

The removal of mature trees for level crossing removal works has been a source of controversy with some local residents and project critics.7273 Due to the nature of the LXRP, trees need to be cut down or relocated from the site to allow for construction works. This is a particular issue for projects where the rail line is lowered into a trench, such as the planned level crossing removals near Glen Huntly station, which have required significant mature tree removal along the planned one-kilometre (0.6 mi) rail trench.7475 An elevated rail design was chosen to remove the level crossings near Rosanna station in part to minimise the loss of native trees, as a proposed rail trench would have required the removal of hundreds of mature river red gum trees along the corridor.7677

According to a newspaper report, more than 10,000 trees have been cut down since 2014 to allow for the construction of Victorian infrastructure projects—including hundreds of trees for the LXRP.78 During the level crossing removal at Moreland Road, a campaign against the removal of 100 mature trees was unsuccessful, with a local councillor claiming only three or four trees remained at the conclusion of the project.79 In response, the government has stated more trees were planted than were there originally, as part of expanded parkland at the site.80 The state opposition has highlighted and campaigned on tree loss due to major infrastructure projects.81

Railway heritage

The loss of heritage railways stations and the impact on heritage architecture has been a source of controversy and a key design consideration for the project. During the removal of a level crossing or rebuild of a railway station, heritage station buildings or existing railway infrastructure may be impacted. Some heritage buildings have been demolished, while others have been retained, moved or adapted for other uses, such as at Clayton and Mentone stations.8283

At the Warrigal Road level crossing removal, Kingston Council have called for heritage protection for the heritage Parkdale railway station buildings.84 This request has been denied by the Department of Environment, Land, Water and Planning as well as Heritage Victoria on grounds that the structure is "not of state-level cultural heritage significance".85 Nonetheless, in response to the local campaign to preserve the original heritage station building, the LXRP announced it would retain and repurpose the building within the precinct, although the extent of the retention is not clear.8687

Other crossing removals have had their heritage structures restored for reuse. At Moreland station, the original heritage station building that opened in 1884 was restored and turned into additional station facilities.88 Heritage restorations are common across the removals, with other examples including the signals box at Gardiner railway station turning into bike parking, and the station building at North Williamstown railway station being restored into community and station facilities.8990

Crossing closures

The use of road closures to remove level crossings has been a source of controversy. The government has used crossing closures in select cases where there are nearby crossing removal projects or existing grade-separated major roads. For example, the crossings at Anderson Street, Yarraville, and Champion Road, Newport will be closed at the same time as the rail line will be elevated above Hudsons Road in nearby Spotswood and at Maddox Road in Newport with new grade-separated pedestrian and cycling crossings also built.91 According to the government, this solution is required is due to the constrained site, significant heritage impacts that would arise from grade separation, and the relatively low level of car traffic on the roads.92 Some local residents, however, have objected to the road closures, arguing there would be significant impacts to local car journeys.93 Similar objections were raised during the 2022 state election by the state opposition over the closure of Latrobe Street in Cheltenham, which similarly is located close to two other grade separated crossings completed in 2020.94 Local businesses, residents and the City of Greater Dandenong have petitioned against the closure of Progress Street in Dandenong, arguing there are safety and congestion concerns.959697

New and amalgamated stations

Due to a large portion of level crossings also having adjacently located stations, many stations have been rebuilt as part of the project. Rebuilt stations have subsequently delivered improve facilities for passengers, including new toilet facilities, drinking fountains, increased levels of accessibility, better integration with surrounding transport connections, and higher quality architectural designs, amongst other benefits.98

Whilst the majority of stations demolished as part of the project have been rebuilt and reopened, a few projects have resulted in the amalgamation of stations. Whilst controversial, these instances have usually only occurred due to the close proximity between existing stations, reducing the negative impact on users. Amalgamated stations have allowed for improved station locations, faster journey times, and higher quality facilities.99 One amalgamation has included Mont Albert and Surrey Hills stations on the Belgrave and Lilydale lines. In 2023, these two stations were closed and amalgamated into the new Union station located in-between the two former locations as part of the removals of Mont Albert and Union roads project.100 This amalgamation has received criticism, with opponents highlighting how the increased distances from the two shopping centres on Union Road and Hamilton Street will negatively impact local mobility.101 Despite community criticism, this project was completed in 2023 with the removal of two level crossings and the opening of the new Union station.102

Reception

Political

The LXRP has generally been seen as a political success for the Andrews government. Journalist Benita Kolovos argued it was the quick rollout of the program and the visible, tangible benefits it delivered to communities that drove its electoral success.103 She wrote: "It was promised at the 2014 election, construction began in the first year of the Andrews government’s term and several were completed before the 2018 election. Commuters benefited from more trains, drivers from less traffic."104 The government's messaging on the project has focused on these localised benefits, public safety, and the prevalence of level crossings within Melbourne. Minister for Transport Infrastructure Jacinta Allan said in 2021: "Every Victorian knows the dinging sound of boom gates coming down and the frustration that comes with it, that’s why we’re getting rid of them – saving lives, easing congestion and getting you home sooner."105

But controversy over design choices and the cost of the project has also prompted opposition. Liberal MP Brad Rowswell criticised the Andrews government for a lack of community consultation and local feedback on the project and claimed that the government was out of touch with the community.106 Shadow Minister for Transport Infrastructure David Davis criticised the project for its cost, arguing that “without a comprehensive business case, there is simply no proper economic justification for the Level Crossing Removal Program".107 The ongoing disruption of roadworks for the project was also an issue in some suburbs.108

Media

The Guardian Australia has called the program "transformational" and "suburb moulding" in comments about the Andrews government's infrastructure projects.109 Other local newspapers, such as The Age and Herald Sun, have been critical of the project and have highlighted local opposition in their reporting.110111112113

Experts and lobby groups

The Public Transport Users Association has campaigned for level-crossing removals, and has welcomed the LXRP and its benefits to the public transport system, with spokesman Daniel Bowen highlighting how the projects "bring a lot of pluses to the wider community, and [how] it’s good to finally see progress on them."114115 The Royal Automobile Club of Victoria have also campaigned for level crossing removals, and have welcomed announcements of crossing removals.116

Academics Ian Woodcock and John Stone have highlighted the benefits from the LXRP, including its urban design opportunities and how it has contributed to the revitalisation of public transportation in Melbourne.117118 Other academics such as Monash University researcher Graham Currie have been critical of the project, arguing the travel time savings resulting from the project were low and did not justify the cost.119

Auditor-General

A report released in December 2017 by the Victorian Auditor-General's Office in the LXRP's original fifty level crossing removals found that the speed and cost of the project carried significant risks.120 The report criticised the Level Crossing Removal Authority for its haste in delivering the program, and found that the rapid pace of the project had contributed to a failure to properly assess the merits of each grade separation. In 2017, the project's cost was found to have increased to $8.3 billion, the project is more than 38% more expensive than its initial $5–6 billion estimated price tag.121

The Auditor-General criticised the selection of crossings, stating that the value of the project was compromised by the apparent political motivation for some crossing removals at the expense of more dangerous or congested intersections.122 In their report, the Auditor-General found that only 32 of the crossings chosen in the original 50 removals were featured in the top 50 of a 2008 list by the Department of Transport of the state's most dangerous level crossings. 28 of these were prioritised on a 2013 VicRoads removal list which was handed to the Napthine government.123

Since these findings, the LXRP has developed and applied a transparent process to select sites for the additional level crossing removals. In a follow-up 2020 report, the Auditor-General stated the new process has improved the project’s cost-effectiveness because it uses delivery efficiency as one of the criteria for site selection.124 The Auditor-General noted the Department and the Major Transport Infrastructure Authority had fully addressed seven of its recommendations, partially addressed one and was working to address two more, but warned that the project had not completed a business case for its second batch of crossing removals so the economic benefits were unclear.125

Public

While the LXRP has been broadly popular, local opposition has attracted significant media attention. Elevated rail has been controversial among some local residents and businesses, with protests over the removal of crossings on the Upfield line calling for a rail trench to be used instead.126127 At the same time, polling has found a majority of Victorians supported the use of elevated rail to remove level crossings.128 In other examples, such as the Caulfield to Dandenong elevated rail project, local media reported that many residents were supportive of the project's outcomes.129130

List of crossing removals

Original 50 crossing removals: 2014–2022

Prior to the 2014 state election, the then Labor opposition announced a plan to remove 50 level crossings by 2022, including 20 by 2018.131 Park Road, Cheltenham, Mascot Avenue, Bonbeach, and Lochiel Avenue, Edithvale were added to the original 50 level crossing removals after further community consultations.132133134 This pushed the number of level crossing removals to 53. These removals were completed on the Glen Waverley, Frankston, Sunbury, Belgrave, Lilydale, Upfield, Pakenham, Cranbourne, Werribee, Craigieburn, and Mernda lines by May 2022.135

Line(s)RoadNearest stationSolutionDate of completion
Glen WaverleyBurke RoadGardinerRail underJanuary 2016136
FrankstonCentre RoadBentleighRail underAugust 2016137
FrankstonMcKinnon RoadMcKinnonRail underAugust 2016138
FrankstonNorth RoadOrmondRail underAugust 2016139
SunburyFurlong RoadGiniferRail underNovember 2016140
SunburyMain RoadSt AlbansRail underNovember 2016141
BelgraveMountain HighwayBayswaterHybridDecember 2016142
BelgraveScoresby RoadBayswaterRail underDecember 2016143
Belgrave, LilydaleBlackburn RoadBlackburnRail underJanuary 2017144
Belgrave, LilydaleHeatherdale RoadHeatherdaleRail underJanuary 2017145
UpfieldCamp RoadGowrieRail underDecember 2017146
SunburyMelton HighwayWatergardensRoad overJanuary 2018147
Cranbourne, PakenhamChandler RoadNoble ParkRail overFebruary 2018148
Cranbourne, PakenhamCorrigan RoadNoble ParkRail overFebruary 2018149
Cranbourne, PakenhamHeatherton RoadNoble ParkRail overFebruary 2018150
Cranbourne, PakenhamCentre RoadClaytonRail overApril 2018151
Cranbourne, PakenhamClayton RoadClaytonRail overApril 2018152
HurstbridgeGrange RoadAlphingtonRail underMay 2018153
HurstbridgeLower Plenty RoadRosannaRail overMay 2018154
Cranbourne, PakenhamGrange RoadCarnegieRail overJune 2018155
Cranbourne, PakenhamKoornang RoadCarnegieRail overJune 2018156
Cranbourne, PakenhamMurrumbeena RoadMurrumbeenaRail overJune 2018157
Cranbourne, PakenhamPoath RoadHughesdaleRail overJune 2018158
FrankstonSkye/Overton RoadKananookRail overJune 2018159
CranbourneThompsons RoadMerinda ParkRoad overJune 2018160
WerribeeKororoit Creek RoadSeaholmeRail overJuly 2018161
CranbourneAbbotts RoadDandenongRail overSeptember 2018162
CraigieburnBuckley StreetEssendonRoad underSeptember 2018163
FrankstonSeaford RoadSeafordHybridSeptember 2018164
WerribeeAviation RoadAircraftRoad overSeptember 2019165
MerndaHigh StreetReservoirRail overDecember 2019166
FrankstonEel Race RoadCarrumClosed offFebruary 2020167
FrankstonMascot AvenueBonbeachClosed offFebruary 2020168
FrankstonStation StreetCarrumRail overFebruary 2020169
Glen WaverleyToorak RoadToorongaRail overApril 2020170
FrankstonBalcombe RoadMentoneRail underJuly 2020171
FrankstonCharman RoadCheltenhamRail underAugust 2020172
FrankstonPark RoadCheltenhamRail underAugust 2020173
UpfieldBell StreetCoburgRail overDecember 2020174
UpfieldMoreland RoadMorelandRail overDecember 2020175
WerribeeWerribee StreetWerribeeRail overJanuary 2021176
WerribeeCherry StreetWerribeeClosed offMarch 2021177
PakenhamSouth Gippsland HighwayDandenongRoad overAugust 2021178
FrankstonBondi RoadBonbeachRail underNovember 2021179
FrankstonEdithvale RoadEdithvaleRail underNovember 2021180
FrankstonLochiel AvenueEdithvaleClosed offNovember 2021181
LilydaleManchester RoadMooroolbarkRail overNovember 2021182
LilydaleMaroondah HighwayLilydaleRail overNovember 2021183
WilliamstownFerguson StreetNorth WilliamstownRail underDecember 2021184
PakenhamClyde RoadBerwickRoad underFebruary 2022185
PakenhamHallam RoadHallamRail overApril 2022186
MerndaBell StreetBellRail overMay 2022187
CraigieburnGlenroy RoadGlenroyRail underMay 2022188

Additional 25 crossing removals: 2022–2025

During the lead up to the 2018 state election, an extra 25 level crossing removals were announced.189 These removals will occur on the Cranbourne, Pakenham, Upfield, Frankston, Mernda, Ballarat, Geelong, Sunbury, Belgrave, Lilydale and Barinsdale lines. This announcement will result in the Cranbourne line being fully level crossing free, with these announcements pushing the number of level crossing removals to 75 by 2025.

Line(s)RoadNearest stationPreferred solutionStatusDate of Completion
CranbourneEvans RoadMerinda ParkRoad overCompletedOctober 2020190
UpfieldMunro StreetCoburgRail overCompletedNovember 2020191
UpfieldReynard StreetCoburgRail overCompletedNovember 2020192
PakenhamCardinia RoadCardinia RoadRoad overCompletedDecember 2020193
FrankstonArgyle AvenueChelseaRail underCompletedNovember 2021194
FrankstonChelsea RoadChelseaClosed offCompletedNovember 2021195
FrankstonSwanpool AvenueChelseaClosed offCompletedNovember 2021196
WerribeeOld Geelong RoadHoppers CrossingClosed offCompletedDecember 2021197
CranbourneGreens RoadDandenongRail overCompletedFebruary 2022198
MerndaCramer StreetPrestonRail overCompletedMay 2022199
MerndaMurray RoadPrestonRail overCompletedMay 2022200
MerndaOakover RoadBellRail overCompletedMay 2022201
Ballarat, GeelongFitzgerald RoadArdeerRoad overCompletedJuly 2022202
Ballarat, GeelongRobinsons RoadDeer ParkRoad underCompletedSeptember 2022203
SunburyGap RoadSunburyRoad underCompletedSeptember 2022204
Ballarat, GeelongMt Derrimut RoadDeer ParkRail overCompletedApril 2023205
Belgrave, LilydaleUnion RoadSurrey HillsRail underCompletedMay 2023206
Belgrave, LilydaleMont Albert RoadMont AlbertRail underCompletedMay 2023207
FrankstonNeerim RoadGlen HuntlyRail underCompletedJune 2023208
FrankstonGlen Huntly RoadGlen HuntlyRail underCompletedJuly 2023209
CranbourneCamms RoadCranbourneRoad overCompletedNovember 2023210
PakenhamMain StreetPakenhamRail overCompletedJune 2024211
PakenhamMcGregor RoadPakenhamRail overCompletedJune 2024212
GippslandRacecourse RoadPakenhamRail overCompletedJune 2024213
Cranbourne, PakenhamWebster StreetDandenongClosed offUnder construction2025214215216

Additional 10 crossing removals: 2023–2025

Boosting the number of removals, the Andrews Labor government announced in July 2021 an extra 10 level crossing removals and 4 closures.217 These removals will occur on the Pakenham, Frankston, Mernda, Sunbury, Belgrave and Lilydale lines. At the conclusion of these removals, the Pakenham and Lilydale lines will join the Cranbourne line in having no road level crossings for their entire length, with these announcements pushing the number of crossing removals to 85 by 2025.218

Line(s)RoadNearest stationPreferred solutionStatusDate of Completion
PakenhamWebb StreetNarre WarrenRail overCompletedDecember 2023219
LilydaleCave Hill RoadLilydaleClosed offCompletedJanuary 2024220
BelgraveBedford RoadRingwoodRail underCompletedMarch 2024221
PakenhamBrunt RoadBeaconsfieldRoad overCompletedApril 2024222
MerndaKeon ParadeKeon ParkRail overCompletedMay 2024223
PakenhamStation StreetOfficerClosed offCompletedMay 2024224
LilydaleDublin RoadRingwood EastRail underCompletedJune 2024225
LilydaleCoolstore RoadCroydonRail overCompletedJuly 2024226
FrankstonWarrigal RoadParkdaleRail overCompletedAugust 2024227
FrankstonParkers RoadParkdaleRail overCompletedAugust 2024228
PakenhamStation StreetBeaconsfieldRoad overCompletedMarch 2025229230
PakenhamProgress StreetDandenongClosed offUnder constructionJune 2025231232233
SunburyCalder Park DriveWatergardensRoad overUnder constructionJuly 2025234
SunburyHolden RoadWatergardensClosed offUnder constructionJuly 2025235

Additional 25 crossing removals: 2025–2030

Prior to the 2022 state election, the State Government announced an extra 25 level crossing removals by 2030. These removals will occur on the Upfield, Ballarat, Sunbury, Hurstbridge, Frankston and Werribee/Williamstown lines.236 At the conclusion of these removals, the Frankston, Sunbury, and Werribee lines will have no road level crossings for their entire length, joining the Cranbourne, Pakenham and Lilydale lines, once projects on those lines are complete.237 These series of announcements have pushed the number of crossing removals to 110.238239240

Line(s)RoadNearest stationPreferred solutionStatusDate of Completion
SunburyOld Calder HighwayDiggers RestRoad overUnder constructionJune 2025241242243
SunburyWatsons RoadDiggers RestRoad overUnder construction2025244245
WerribeeChampion RoadNewportClosed offUnder construction2026246247
BallaratCoburns RoadMeltonRail overUnder construction2026248249
BallaratExford RoadMeltonRail overUnder construction2026250251
BallaratFerris RoadCobblebankRoad overUnder construction2026252253
BallaratHopkins RoadCaroline SpringsRoad overUnder construction2026254255
WerribeeMaddox RoadNewportRail overUnder construction2026256257
FrankstonBear StreetMordiallocClosed offPlanning2026258
FrankstonMcDonald StreetMordiallocRail overPlanning2026259
FrankstonStation StreetMordiallocRail overPlanning2026260
HurstbridgeRuthven StreetMacleodRail overUnder construction2027261262
WerribeeMaidstone StreetLaverton263Road overPlanning2027264
Werribee, WilliamstownHudsons RoadSpotswoodRail overEarly planning2028265
FrankstonArmstrongs RoadSeafordRail overEarly planning2029266
FrankstonGroves StreetAspendaleRail underEarly planning2029267
FrankstonHighett RoadHighettRail overEarly planning2029268
FrankstonLatrobe StreetMentoneClosed offEarly planning2029269
FrankstonStation StreetSeafordRail overEarly planning2029270
FrankstonWickham RoadHighettRail overEarly planning2029271
UpfieldAlbert StreetBrunswickRail overEarly planning2030272
UpfieldAlbion StreetAnsteyRail overEarly planning2030273
Werribee, WilliamstownAnderson StreetYarravilleClosed offEarly planning2030274
UpfieldBrunswick RoadJewellRail overEarly planning2030275
UpfieldDawson StreetJewellRail overEarly planning2030276
UpfieldHope StreetAnsteyRail overEarly planning2030277
UpfieldUnion StreetJewellRail overEarly planning2030278
UpfieldVictoria StreetBrunswickRail overEarly planning2030279
UpfieldPark StreetJewellRail overEarly planning2030280

New and rebuilt stations

There will be 51 railway stations rebuilt as part of the LXRP. Four stations are being added to the metropolitan network as part of suburban rail extensions delivered by the LXRP. Three of these stations, Hawkstowe, Middle Gorge and Mernda were added as part of the Mernda rail extension, which extended the former South Morang line eight kilometres (5.0 mi) north to Mernda. The extension, announced by Labor at the 2014 state election, opened in 2018.281282 As part of the level crossing removals along the Pakenham line, a new station was added at East Pakenham along with a short rail extension.283 The LXRP also delivered a new infill station at Southland on the Frankston line.284 In one case, the nearby Mont Albert and Surrey Hills railway stations on the Belgrave and Lilydale lines were merged and replaced with a brand new Union station located between them.285286

Line(s)StationImageStatusCompletion date
Glen WaverleyGardinerOpenJanuary 2016287
FrankstonMcKinnonOpenAugust 2016288
FrankstonBentleighOpenAugust 2016289
FrankstonOrmondOpenAugust 2016290
SunburyGiniferOpenNovember 2016291
SunburySt AlbansOpenNovember 2016292
BelgraveBayswaterOpenDecember 2016293
Belgrave, LilydaleHeatherdaleOpenFebruary 2017294
FrankstonSouthland (new)OpenNovember 2017295
Cranbourne, PakenhamNoble ParkOpenFebruary 2018296
Cranbourne, PakenhamClaytonOpenApril 2018297
HurstbridgeRosannaOpenMay 2018298
Cranbourne, PakenhamCarnegieOpenJune 2018299
Frankston, Stony PointFrankstonOpenJune 2018300
Cranbourne, PakenhamMurrumbeenaOpenJune 2018301
Cranbourne, PakenhamHughesdaleOpenAugust 2018302
MerndaHawkstowe (new)OpenAugust 2018303
MerndaMernda (new)OpenAugust 2018304
MerndaMiddle Gorge (new)OpenAugust 2018305
MerndaReservoirOpenDecember 2019306
FrankstonCarrumOpenFebruary 2020307
FrankstonMentoneOpenJuly 2020308
FrankstonCheltenhamOpenAugust 2020309
UpfieldCoburgOpenDecember 2020310
UpfieldMorelandOpenDecember 2020311
LilydaleLilydaleOpenNovember 2021312
LilydaleMooroolbarkOpenNovember 2021313
FrankstonBonbeachOpenNovember 2021314
FrankstonChelseaOpenNovember 2021315
FrankstonEdithvaleOpenNovember 2021316
WilliamstownNorth WilliamstownOpenDecember 2021317
CranbourneMerinda ParkOpenFebruary 2022318
PakenhamHallamOpenMay 2022319
CraigieburnGlenroyOpenMay 2022320
MerndaBellOpenSeptember 2022321
MerndaPrestonOpenSeptember 2022322
Ballarat, GeelongDeer ParkOpenApril 2023323
HurstbridgeGreensboroughOpenApril 2023324
HurstbridgeMontmorencyOpenApril 2023325
Belgrave, LilydaleUnion (new)OpenMay 2023326
FrankstonGlen HuntlyOpenJuly 2023327
PakenhamNarre WarrenOpenMarch 2024328
PakenhamEast Pakenham (new)OpenJune 2024329
PakenhamPakenhamOpenJune 2024330
MerndaKeon ParkOpenJune 2024331
LilydaleRingwood EastOpenJuly 2024332
FrankstonParkdaleOpenAugust 2024333
LilydaleCroydonOpenAugust 2024334
BallaratMeltonUnder construction2026335336
FrankstonMordiallocPlanning2026337
Werribee, WilliamstownSpotswoodEarly planning2028338
FrankstonAspendaleEarly planning2029339
FrankstonHighettEarly planning2029340
FrankstonSeafordEarly planning2029341
UpfieldAnsteyEarly planning2030342
UpfieldBrunswickEarly planning2030343
UpfieldJewellEarly planning2030344

See also

Notes

References

  1. "About – Level Crossing Removal Project". Level Crossing Removal Authority. Archived from the original on 12 December 2016. Retrieved 7 January 2017. http://levelcrossings.vic.gov.au/about

  2. "Andrews pledges 25 new level crossing removals in Melbourne". ABC News. 21 October 2018. Archived from the original on 31 October 2018. Retrieved 28 October 2018. https://www.abc.net.au/news/2018-10-21/new-melbourne-level-crossing-removals-to-include-sky-rail/10401896

  3. "Ten More Level Crossings To Go By 2025 | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 29 July 2021. Retrieved 9 August 2021. http://www.premier.vic.gov.au/ten-more-level-crossings-go-2025

  4. Fowler, Michael (29 July 2021). "Big Build swells: Andrews adds $2.5b, five new stations and 10 level crossing removals". The Age. Archived from the original on 9 August 2021. Retrieved 9 August 2021. https://www.theage.com.au/politics/victoria/big-build-swells-andrews-adds-2-5b-five-new-stations-and-10-level-crossing-removals-20210729-p58e3b.html

  5. Department of Transport (September 2019). "Annual Report 2018-19" (PDF). Archived (PDF) from the original on 9 November 2021. Retrieved 9 November 2021. https://transport.vic.gov.au/-/media/tfv-documents/dot-annual-report-1819.pdf?la=en&hash=B21A6EF6EF7406A3A9FA3F0699283FFD

  6. "Level Crossing Removal Project". Victoria’s Big Build. 26 October 2022. Archived from the original on 21 September 2022. Retrieved 6 December 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project

  7. "Abolition of Busy Level Crossings" Railway Gazette 13 August 1954 page 176 /wiki/Railway_Gazette_International

  8. "Abolishing Level Crossings in Victoria" Railway Gazette 30 December 1955 pages 769–771

  9. "Abolition of Level Crossings in Victoria" Railway Gazette 4 November 1960 pages 539–540

  10. "DVN61: Crossing The Line: Boronia's forgotten killer intersection". DVN61. 7 July 2013. Archived from the original on 6 December 2022. Retrieved 6 December 2022. https://dvn61.blogspot.com/2013/07/crossing-line-boronias-forgotten-killer.html

  11. "Infrastructure" Railway Gazette International July 2009 page 14 /wiki/Railway_Gazette_International

  12. Springvale road and rail grade separation Archived 12 March 2017 at the Wayback Machine Arup http://www.arup.com/projects/springvale_road_rail_grade_separation

  13. "Anderson rd level crossing in sunshine finally removed". 2014. Archived from the original on 6 December 2022. Retrieved 6 December 2022. https://www.heraldsun.com.au/leader/west/anderson-rd-level-crossing-in-sunshine-finally-removed/news-story/14cccb860b04cf71f8998d9fc61fdbd6

  14. "Level crossings: Which are funded to be removed, which are promised? – Daniel Bowen". 16 March 2024. Archived from the original on 16 March 2024. Retrieved 29 April 2024. https://web.archive.org/web/20240316085125/https://danielbowen.com/2014/09/24/level-crossing-list/

  15. "Melbourne Level Crossing Map". Google My Maps. Retrieved 29 April 2024. https://www.google.com/maps/d/viewer?mid=1VXxXzwyyM5zSajCNuUedc3WQoSWBFjy-

  16. Woodcock, Ian; Stone, John (2016). "The Benefits of Level Crossing Removal: lessons from Melbourne's historical experience". University of Melbourne/RMIT University: 13. Archived from the original on 6 December 2022. Retrieved 6 December 2022 – via RMIT Researchbank. https://researchrepository.rmit.edu.au/esploro/outputs/9921860675101341

  17. "Strategic framework for the prioritisation of level crossings in metropolitan Melbourne" (PDF). Parliament of Victoria. Archived from the original (PDF) on 13 March 2017. Retrieved 12 September 2022. https://web.archive.org/web/20170313075632/http://www.parliament.vic.gov.au/images/stories/committees/pomsc/Other_Docs/VicRoads_Report_05102015.pdf

  18. Carey, Adam (26 October 2015). "Level crossings: VicRoads list of Melbourne's worst overlooked by Labor". The Age. Archived from the original on 23 May 2017. Retrieved 7 January 2017. http://www.theage.com.au/victoria/level-crossings-vicroads-list-of-melbournes-worst-overlooked-by-labor-20151023-gkh3s1.html

  19. Moorabbin Kingston Leader (6 September 2016). "Level Crossing Removal Authority releases plans for Frankston line". Archived from the original on 2 January 2017. Retrieved 22 November 2022. https://www.heraldsun.com.au/leader/inner-south/level-crossing-removal-authority-releases-plans-for-frankston-line/news-story/21d8af26190121d9c8343bedf66fb038

  20. Promise Delivered: Port Of Melbourne Leased To Remove Level Crossings And Create Thousands Of Jobs Archived 6 December 2022 at the Wayback Machine Premier of Victoria 19 September 2016 http://www.premier.vic.gov.au/promise-delivered-port-of-melbourne-leased-to-remove-level-crossings-and-create-thousands-of-jobs/

  21. Towell, Craig Butt, Noel (21 October 2018). "Another 25 rail level crossings to go under Labor pledge". The Age. Archived from the original on 22 October 2018. Retrieved 28 October 2018.{{cite web}}: CS1 maint: multiple names: authors list (link) https://www.theage.com.au/politics/victoria/25-more-rail-level-crossings-to-go-under-labor-pledge-20181021-p50b07.html

  22. "Andrews pledges 25 new level crossing removals in Melbourne". ABC News. 21 October 2018. Archived from the original on 31 October 2018. Retrieved 28 October 2018. https://www.abc.net.au/news/2018-10-21/new-melbourne-level-crossing-removals-to-include-sky-rail/10401896

  23. Fowler, Michael (29 July 2021). "Big Build swells: Andrews adds $2.5b, five new stations and 10 level crossing removals". The Age. Archived from the original on 9 August 2021. Retrieved 9 August 2021. https://www.theage.com.au/politics/victoria/big-build-swells-andrews-adds-2-5b-five-new-stations-and-10-level-crossing-removals-20210729-p58e3b.html

  24. "10 more level crossings to go by 2025". levelcrossings.vic.gov.au. 29 July 2021. Archived from the original on 30 July 2021. Retrieved 30 July 2021. https://levelcrossings.vic.gov.au/media/news/10-more-level-crossings-to-go-by-2025

  25. "Eight More Dangerous Level Crossings To Go By 2027 | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 19 September 2022. Retrieved 19 September 2022. http://www.premier.vic.gov.au/eight-more-dangerous-level-crossings-go-2027

  26. Eddie, Rachael Dexter, Rachel (19 September 2022). "Eight level crossings to be removed in Melbourne's north". The Age. Archived from the original on 19 September 2022. Retrieved 19 September 2022.{{cite web}}: CS1 maint: multiple names: authors list (link) https://www.theage.com.au/politics/victoria/eight-level-crossings-to-be-removed-in-melbourne-s-north-20220919-p5bj6c.html

  27. Eddie, Rachael Dexter, Rachel (19 September 2022). "Eight level crossings to be removed in Melbourne's north". The Age. Archived from the original on 19 September 2022. Retrieved 19 September 2022.{{cite web}}: CS1 maint: multiple names: authors list (link) https://www.theage.com.au/politics/victoria/eight-level-crossings-to-be-removed-in-melbourne-s-north-20220919-p5bj6c.html

  28. "Eight More Dangerous Level Crossings To Go By 2027 | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 19 September 2022. Retrieved 19 September 2022. http://www.premier.vic.gov.au/eight-more-dangerous-level-crossings-go-2027

  29. "Making Melton level crossing-free". Victoria’s Big Build. 6 October 2022. Archived from the original on 6 October 2022. Retrieved 6 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/making-melton-level-crossing-free

  30. "Victorian opposition pledges to cap public transport fares at $2 a day". ABC News. 9 October 2022. Archived from the original on 9 October 2022. Retrieved 27 October 2022. https://www.abc.net.au/news/2022-10-09/victorian-election-promises-2-dollar-public-transport/101516028

  31. "Victorian opposition pledges to cap public transport fares at $2 a day". ABC News. 9 October 2022. Archived from the original on 9 October 2022. Retrieved 27 October 2022. https://www.abc.net.au/news/2022-10-09/victorian-election-promises-2-dollar-public-transport/101516028

  32. Tribune, The National (8 October 2022). "Making Frankston Line Level Crossing Free". The National Tribune. Archived from the original on 9 October 2022. Retrieved 9 October 2022. https://www.nationaltribune.com.au/making-frankston-line-level-crossing-free/?tt=1665272712

  33. "Making Macleod level crossing-free". Victoria’s Big Build. 25 October 2022. Archived from the original on 25 October 2022. Retrieved 25 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/making-macleod-level-crossing-free

  34. "Making the Sunbury Line level crossing-free". Victoria’s Big Build. 21 October 2022. Archived from the original on 21 October 2022. Retrieved 21 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/making-the-sunbury-line-level-crossing-free

  35. Chan, Ray (26 October 2022). "All Werribee Line crossings set for removal". Rail Express. Archived from the original on 27 October 2022. Retrieved 27 October 2022. https://www.railexpress.com.au/all-werribee-line-crossings-set-for-removal/

  36. "Werribee Line level crossing removals". Victoria’s Big Build. 26 October 2022. Archived from the original on 27 October 2022. Retrieved 27 October 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/werribee

  37. "Werribee Line level crossing removals". Victoria’s Big Build. 26 October 2022. Archived from the original on 27 October 2022. Retrieved 27 October 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/werribee

  38. "Making The Werribee Line Level Crossing Free | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 25 October 2022. Retrieved 26 October 2022. http://www.premier.vic.gov.au/making-werribee-line-level-crossing-free

  39. "Making The Werribee Line Level Crossing Free | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 25 October 2022. Retrieved 26 October 2022. http://www.premier.vic.gov.au/making-werribee-line-level-crossing-free

  40. "Victoria Government Gazette – No. G 18 Thursday 7 May 2015" (PDF). Victoria Government Gazette. 7 May 2015. p. 74. Archived (PDF) from the original on 23 October 2015. Retrieved 7 January 2017. http://www.gazette.vic.gov.au/gazette/Gazettes2015/GG2015G018.pdf

  41. "Melbourne level crossing removal plan to be fast-tracked, Government says". ABC News. 15 February 2015. Archived from the original on 3 May 2017. Retrieved 7 January 2017. http://www.abc.net.au/news/2015-02-15/removal-of-50-level-crossings-to-be-fast-tracked-through-/6106696

  42. "About the authority". Level Crossing Removal Authority. Archived from the original on 27 December 2016. Retrieved 7 January 2017. https://web.archive.org/web/20161227173054/http://levelcrossings.vic.gov.au/about/about-the-authority

  43. "Wyndham Vale Train Stabling – Mcconnell Dowell". www.mcconnelldowell.com. Archived from the original on 12 December 2022. Retrieved 12 December 2022. https://www.mcconnelldowell.com/projects/wyndham-vale-train-stabling

  44. Bayside News (18 May 2020). "Train stabling facility finished". Bayside News. Archived from the original on 12 December 2022. Retrieved 12 December 2022. https://baysidenews.com.au/2020/05/18/train-stabling-facility-finished/

  45. "About the Major Transport Infrastructure Authority". Victoria’s Big Build. 28 April 2021. Archived from the original on 31 October 2022. Retrieved 31 October 2022. https://bigbuild.vic.gov.au/about/mtia

  46. Woodcock, Ian (January 2020). "On track: Level Crossing Removal Project". Architecture Australia. Archived from the original on 22 December 2022. Retrieved 20 September 2022. https://architectureau.com/articles/level-crossing-removal-project/

  47. Woodcock, Ian (January 2020). "On track: Level Crossing Removal Project". Architecture Australia. Archived from the original on 22 December 2022. Retrieved 20 September 2022. https://architectureau.com/articles/level-crossing-removal-project/

  48. Woodcock, Ian (January 2020). "On track: Level Crossing Removal Project". Architecture Australia. Archived from the original on 22 December 2022. Retrieved 20 September 2022. https://architectureau.com/articles/level-crossing-removal-project/

  49. Rothenbury, Camryn (10 April 2018). "Level-crossing removals: learning from Melbourne's experience". Melbourne School of Design. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://msd.unimelb.edu.au/research/projects/completed/level-crossing-removals-learning-from-melbournes-experience

  50. Browne, Geoffrey; Lowe, Melanie (22 January 2021). "Level-crossing removals: a case study in why major projects must also be investments in health". The Conversation. Archived from the original on 22 September 2022. Retrieved 20 September 2022. https://theconversation.com/level-crossing-removals-a-case-study-in-why-major-projects-must-also-be-investments-in-health-149820

  51. Browne, Geoffrey R.; Lowe, Melanie (1 March 2021). "Liveability as determinant of health: Testing a new approach for health impact assessment of major infrastructure". Environmental Impact Assessment Review. 87: 106546. Bibcode:2021EIARv..8706546B. doi:10.1016/j.eiar.2020.106546. ISSN 0195-9255. S2CID 233784494. https://www.sciencedirect.com/science/article/pii/S0195925520308246

  52. "2021 Passenger Stations". Prix Versailles. Archived from the original on 13 December 2022. Retrieved 13 December 2022. https://www.prix-versailles.com/2021-passenger-stations

  53. "Fantastique Reservoir – world architecture and rail sustainability winner". Victoria’s Big Build. 31 December 2021. Archived from the original on 31 October 2022. Retrieved 31 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/fantastique-reservoir-world-architecture-and-design-award

  54. "Level crossings top landscape architecture awards". Victoria’s Big Build. 19 July 2022. Archived from the original on 30 October 2022. Retrieved 31 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/level-crossings-top-landscape-architecture-awards

  55. "Level crossings top landscape architecture awards". Victoria’s Big Build. 19 July 2022. Archived from the original on 30 October 2022. Retrieved 31 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/level-crossings-top-landscape-architecture-awards

  56. "2022 AILA Landscape Architecture Award Winners | Ace Contractors Group Pty Ltd". 11 July 2022. Archived from the original on 31 October 2022. Retrieved 31 October 2022. https://www.acecon.com.au/2022-aila-landscape-architecture-award-winners/

  57. Chan, Ray (13 June 2022). "Sustainability award for Bell-Moreland level crossing removal project". Rail Express. Archived from the original on 31 October 2022. Retrieved 31 October 2022. https://www.railexpress.com.au/sustainability-award-for-bell-moreland-level-crossing-removal-project/

  58. Carey, Adam (8 February 2016). "Melbourne sky rail: Many questions remain about Andrews government plan". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/melbourne-sky-rail-many-questions-remain-about-andrews-government-plan-20160208-gmo67k.html

  59. Carey, Adam (8 February 2016). "Melbourne sky rail: Many questions remain about Andrews government plan". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/melbourne-sky-rail-many-questions-remain-about-andrews-government-plan-20160208-gmo67k.html

  60. Woodcock, Ian; Stone, John (22 February 2016). "The 'sky rail' saga: can big new transport projects ever run smoothly?". The Conversation. Archived from the original on 21 September 2022. Retrieved 20 September 2022. https://theconversation.com/the-sky-rail-saga-can-big-new-transport-projects-ever-run-smoothly-54383

  61. Willingham, Richard (16 February 2016). "Sky rail: Premier Andrews stands by consultation process in face of anger". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/skyrail-premier-andrews-stands-by-consultation-process-in-face-of-anger-20160216-gmv6ou.html

  62. Willingham, Richard (4 September 2016). "Sky rail gets strong backing from voters". The Courier. Archived from the original on 4 December 2016. Retrieved 20 September 2022. http://www.theage.com.au/victoria/sky-rail-gets-strong-backing-from-voters-20160904-gr89nx.html

  63. Szego, Julie (10 February 2016). "Sky rail more an eye opener than an eyesore". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/opinion/less-an-eyesore-than-an-eye-opener-sky-rail-would-open-more-melbourne-to-the-world-20160210-gmq1mi.html

  64. Preiss, Benjamin (1 November 2018). "Andrews targets key marginal with latest sky rail announcement". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/politics/victoria/andrews-targets-key-marginal-with-latest-sky-rail-announcement-20181101-p50dbv.html

  65. Woodcock, Ian; Stone, John (22 February 2016). "The 'sky rail' saga: can big new transport projects ever run smoothly?". The Conversation. Archived from the original on 21 September 2022. Retrieved 20 September 2022. https://theconversation.com/the-sky-rail-saga-can-big-new-transport-projects-ever-run-smoothly-54383

  66. "Rail lines over roads can help with more than just traffic jams". ArchitectureAU. Archived from the original on 2 December 2021. Retrieved 20 September 2022. https://architectureau.com/articles/rail-lines-over-roads-can-help-with-more-than-just-traffic-jams/

  67. Woodcock, Ian (January 2020). "On track: Level Crossing Removal Project". Architecture Australia. Archived from the original on 22 December 2022. Retrieved 20 September 2022. https://architectureau.com/articles/level-crossing-removal-project/

  68. Landezine International Landscape Award LILA (2019). "Caulfield to Dandenong Level Crossing Removal Project". Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://landezine-award.com/caulfield-to-dandenong-level-crossing-removal-project-2/

  69. Jacks, Timna (13 November 2017). "Life under the viaduct: Melbourne's south-east Skyrail will get a 'green up'". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/life-under-the-viaduct-melbournes-southeast-skyrail-will-get-a-green-up-20171113-gzk4dl.html

  70. Sakkal, Paul (12 May 2019). "More than a year on, has 'sky rail' turned suburbs into ghettos?". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/more-than-a-year-on-has-sky-rail-turned-suburbs-into-ghettos-20190509-p51lqm.html

  71. Cowie, Tom (16 April 2018). "New sky rail station opens – and residents are happy about it". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/new-sky-rail-station-opens-and-residents-are-happy-about-it-20180416-p4z9wx.html

  72. Lucas, Clay (3 January 2021). "Anger grows as thousands of trees axed in transport building blitz". The Age. Archived from the original on 23 October 2022. Retrieved 23 October 2022. https://www.theage.com.au/national/victoria/anger-as-thousands-of-trees-axed-in-transport-building-blitz-20210101-p56r6j.html

  73. "Why are trees dying at this Melbourne train station?". ABC News. 2 September 2021. Archived from the original on 24 October 2022. Retrieved 23 October 2022. https://www.abc.net.au/news/2021-09-02/dead-trees-at-moreland-station/100425132

  74. "Level crossing removals: 600 trees to go for Glen Huntly trench". Herald Sun. 8 February 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://www.heraldsun.com.au/leader/inner-south/iconic-plane-trees-paperbarks-along-frankston-line-glen-huntly-at-risk/news-story/1a2b70f3513c790e8e48606a436aae84

  75. "Works notice – vegetation removal in Glen Huntly". Victoria’s Big Build. 20 June 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://bigbuild.vic.gov.au/library/level-crossing-removal-project/frankston/glen-huntly/works/works-notice-vegetation-removal-in-glen-huntly

  76. Carey, Adam (28 September 2016). "Hundreds of red gums at risk if trench is built at Rosanna rail crossing". The Age. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://www.theage.com.au/national/victoria/hundreds-of-red-gums-at-risk-if-trench-is-built-at-rosanna-rail-crossing-20160928-grqiqs.html

  77. Koenig, Rick (7 February 2017). "Design finalised for Lower Plenty Rd level crossing removal". Herald Sun. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://www.heraldsun.com.au/leader/east/design-finalised-for-lower-plenty-rd-level-crossing-removal/news-story/a6b24a801d60f9874de343fb4b055b2d

  78. Lucas, Clay (3 January 2021). "Anger grows as thousands of trees axed in transport building blitz". The Age. Archived from the original on 23 October 2022. Retrieved 23 October 2022. https://www.theage.com.au/national/victoria/anger-as-thousands-of-trees-axed-in-transport-building-blitz-20210101-p56r6j.html

  79. Lucas, Clay (3 January 2021). "Anger grows as thousands of trees axed in transport building blitz". The Age. Archived from the original on 23 October 2022. Retrieved 23 October 2022. https://www.theage.com.au/national/victoria/anger-as-thousands-of-trees-axed-in-transport-building-blitz-20210101-p56r6j.html

  80. Lucas, Clay (3 January 2021). "Anger grows as thousands of trees axed in transport building blitz". The Age. Archived from the original on 23 October 2022. Retrieved 23 October 2022. https://www.theage.com.au/national/victoria/anger-as-thousands-of-trees-axed-in-transport-building-blitz-20210101-p56r6j.html

  81. Lucas, Clay (3 January 2021). "Anger grows as thousands of trees axed in transport building blitz". The Age. Archived from the original on 23 October 2022. Retrieved 23 October 2022. https://www.theage.com.au/national/victoria/anger-as-thousands-of-trees-axed-in-transport-building-blitz-20210101-p56r6j.html

  82. "Station serves up a slice of history". Bayside News. 2 February 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://baysidenews.com.au/2022/02/02/station-serves-up-a-slice-of-history/

  83. "TAFE class assist with Clayton Station restoration". Victoria’s Big Build. 14 June 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/station-restoration-in-clayton

  84. "Council's call for Parkdale Train Station heritage protection refused". Mirage News. 16 September 2022. Archived from the original on 24 January 2023. Retrieved 24 October 2022. https://www.miragenews.com/councils-call-for-parkdale-train-station-856131/

  85. Cowburn, Brodie (21 September 2022). "Heritage hopes for train station dashed". Bayside News. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://baysidenews.com.au/2022/09/21/heritage-hopes-for-train-station-dashed/

  86. "New design features old station building". Bayside News. 12 October 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://baysidenews.com.au/2022/10/12/new-design-features-old-station-building/

  87. "Updated designs released for Parkdale level crossings". Victoria’s Big Build. 1 October 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/updated-designs-released-for-parkdale-level-crossings

  88. "Bell to Moreland comes out on top!". Victoria’s Big Build. 8 June 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/bell-to-moreland-comes-out-on-top

  89. "Ferguson Street, Williamstown". Victoria’s Big Build. 21 June 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/ferguson-street-williamstown

  90. "Burke Road, Glen Iris". Victoria’s Big Build. 22 June 2022. Archived from the original on 24 October 2022. Retrieved 24 October 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/burke-road-glen-iris

  91. "Making The Werribee Line Level Crossing Free | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 25 October 2022. Retrieved 26 October 2022. http://www.premier.vic.gov.au/making-werribee-line-level-crossing-free

  92. "Making The Werribee Line Level Crossing Free | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 25 October 2022. Retrieved 26 October 2022. http://www.premier.vic.gov.au/making-werribee-line-level-crossing-free

  93. "'It would divide our community': Newport locals slam level crossing removal". ABC Melbourne. 27 October 2022. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.abc.net.au/melbourne/programs/drive/newport-champion-road-level-crossing-removal/101586900

  94. Staszewska, Ewa (4 November 2022). "'Dictate from their ivory tower': Andrews upsets marginal Melbourne seat". Sky News. Archived from the original on 6 November 2022. Retrieved 6 November 2022. https://www.skynews.com.au/australia-news/politics/liberal-mp-criticises-daniel-andrews-government-as-removed-from-reality-over-victorian-bayside-level-crossing-closure/news-story/01ad910442ea80749c315722cf3166b9

  95. Lucadou-Wells, Cam (20 December 2023). "Level-crossing redesign still 'dangerous'". Dandenong Star Journal. Retrieved 2 February 2025. https://dandenong.starcommunity.com.au/news/2023-12-20/level-crossing-redesign-still-dangerous/

  96. Foladi, Sahar (30 November 2023). "'Dangers' posted on Progress Street". Dandenong Star Journal. Retrieved 2 February 2025. https://dandenong.starcommunity.com.au/news/2023-12-01/dangers-posted-on-progress-street/

  97. Foladi, Sahar (13 August 2023). "Council calls for halt to Progress". Dandenong Star Journal. Retrieved 2 February 2025. https://dandenong.starcommunity.com.au/news/2023-08-14/council-calls-for-halt-to-progress/

  98. "Murrumbeena Rail Station LXRP". Mascot Engineering. Retrieved 25 March 2024. https://www.mascoteng.com.au/case-study/murrumbeena-station-upgrade/

  99. Victoria’s Big Build (15 June 2022). "Union Road, Surrey Hills and Mont Albert Road, Mont Albert – selecting the best design". Victoria’s Big Build. Retrieved 13 April 2024. https://bigbuild.vic.gov.au/library/level-crossing-removal-project/bel-lil/mont-albert-surrey-hills/community-updates-and-fact-sheets/union-road,-surrey-hills-and-mont-albert-road,-mont-albert-selecting-the-best-design

  100. "Union Road, Surrey Hills and Mont Albert Road, Mont Albert". Engage Victoria. Retrieved 25 March 2024. https://engage.vic.gov.au/lxrp-surrey-hills-and-mont-albert

  101. "Union Road, Surrey Hills and Mont Albert Road, Mont Albert level crossing removals Submission from Boroondara City Council". Boroondara City Council. Retrieved 25 March 2024. https://www.boroondara.vic.gov.au/media/69626/download?inline

  102. "Mont Albert Road, Mont Albert". Victoria’s Big Build. 3 August 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mont-albert-road-mont-albert

  103. Kolovos, Benita (1 April 2022). "Analysis: Australia's busiest state government goes into hibernation". the Guardian. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.theguardian.com/australia-news/2022/apr/02/australias-busiest-state-government-goes-into-hibernation-not-just-isolation

  104. Kolovos, Benita (1 April 2022). "Analysis: Australia's busiest state government goes into hibernation". the Guardian. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.theguardian.com/australia-news/2022/apr/02/australias-busiest-state-government-goes-into-hibernation-not-just-isolation

  105. Andrews, Daniel (29 July 2021). "Premier of Victoria: Ten More Level Crossings To Go By 2025". Archived from the original on 24 October 2022. Retrieved 12 November 2022. https://www.premier.vic.gov.au/ten-more-level-crossings-go-2025

  106. Staszewska, Ewa (4 November 2022). "'Dictate from their ivory tower': Andrews upsets marginal Melbourne seat". Sky News. Archived from the original on 6 November 2022. Retrieved 6 November 2022. https://www.skynews.com.au/australia-news/politics/liberal-mp-criticises-daniel-andrews-government-as-removed-from-reality-over-victorian-bayside-level-crossing-closure/news-story/01ad910442ea80749c315722cf3166b9

  107. Davis, Davis (14 October 2020). "Press release: Allan and level crossing cowboys oversee a billion dollar blowout". vic.liberal.org.au. Archived from the original on 6 November 2022. Retrieved 6 November 2022. https://vic.liberal.org.au/media-releases/2020-10-14-allan-and-level-crossing-cowboys-oversee-a-billion-dollar-blowout?topic=public-transport

  108. Wahlquist, Calla; Bowers, Mike (2018). "Victorian election 2018: On the ground in Cranbourne part 1". The Guardian. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.theguardian.com/australia-news/ng-interactive/2018/oct/31/victorian-election-2018-on-the-ground-in-cranbourne-part-1

  109. "The Daniel Andrews paradox: the enduring appeal of Australia's most divisive premier". the Guardian. 29 October 2022. Archived from the original on 2 November 2022. Retrieved 2 November 2022. https://www.theguardian.com/australia-news/2022/oct/30/the-daniel-andrews-paradox-the-enduring-appeal-of-australias-most-divisive-premier

  110. Carey, Adam (14 December 2017). "Level crossing removal program poor value for money: Auditor-General Andrew Greaves". The Age. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.theage.com.au/national/victoria/level-crossing-removal-program-poor-value-for-money-auditorgeneral-andrew-greaves-20171214-h04ed0.html

  111. Abbott, Lachlan (17 August 2022). "Barred from their own street, residents fume at handling of level crossing works". The Age. Archived from the original on 20 September 2022. Retrieved 12 November 2022. https://www.theage.com.au/politics/victoria/barred-from-their-own-street-residents-fume-at-handling-of-level-crossing-works-20220817-p5ban1.html

  112. Jacks, Timna (23 January 2018). "Just a minute: Level crossing project resulting in small time savings, data shows". The Age. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.theage.com.au/national/victoria/just-a-minute-level-crossing-project-resulting-in-small-time-savings-data-shows-20180123-p4yys5.html

  113. Masanauskas, John (17 August 2022). "Melbourne's leafy east set for level crossing removal mayhem". Herald Sun. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.heraldsun.com.au/news/victoria/melbournes-leafy-east-set-for-level-crossing-removal-mayhem/news-story/9a74fb970bb887e2217bcf2c679fa70a

  114. "Benefits to non-motorists from level crossing removals". Daniel Bowen. 15 December 2015. Archived from the original on 6 November 2022. Retrieved 6 November 2022. https://www.danielbowen.com/2015/12/15/grade-separation-benefits/

  115. "Level crossing removal – all options must be on the table | Public Transport Users Association (Victoria, Australia)". Public Transport Users Association. 11 January 2016. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.ptua.org.au/2016/01/11/level-crossing-options/

  116. AAP (19 August 2014). "Do more on Victorian transport: RACV". Retrieved 6 November 2022. https://www.couriermail.com.au/news/breaking-news/do-more-on-victorian-transport-racv/news-story/6fb8bb9f46538660b2f14c87c76a1515

  117. Woodcock, Ian; Stone, John (2016). "The Benefits of Level Crossing Removal: lessons from Melbourne's historical experience". University of Melbourne, RMIT University. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://researchrepository.rmit.edu.au/esploro/outputs/report/The-Benefits-of-Level-Crossing-Removal-lessons-from-Melbournes-historical-experience/9921860675101341

  118. Woodcock, Ian (January 2020). "On track: Level Crossing Removal Project". Architecture Australia. Archived from the original on 22 December 2022. Retrieved 20 September 2022. https://architectureau.com/articles/level-crossing-removal-project/

  119. Jacks, Timna (23 January 2018). "Just a minute: Level crossing project resulting in small time savings, data shows". The Age. Archived from the original on 12 November 2022. Retrieved 12 November 2022. https://www.theage.com.au/national/victoria/just-a-minute-level-crossing-project-resulting-in-small-time-savings-data-shows-20180123-p4yys5.html

  120. "Managing the Level Crossing Removal Program". Victorian Auditor-General's Office. Archived from the original on 1 November 2022. Retrieved 1 November 2022. https://www.audit.vic.gov.au/report/managing-level-crossing-removal-program

  121. "Managing the Level Crossing Removal Program". Victorian Auditor-General's Office. Archived from the original on 1 November 2022. Retrieved 1 November 2022. https://www.audit.vic.gov.au/report/managing-level-crossing-removal-program

  122. Carey, Adam (14 December 2017). "Level crossing removal program poor value for money: Auditor-General Andrew Greaves". The Age. Archived from the original on 14 December 2017. Retrieved 14 December 2017. http://www.theage.com.au/victoria/level-crossing-removal-program-poor-value-for-money-auditorgeneral-andrew-greaves-20171214-h04ed0.html

  123. "Managing the Level Crossing Removal Program". Victorian Auditor-General's Office. Archived from the original on 1 November 2022. Retrieved 1 November 2022. https://www.audit.vic.gov.au/report/managing-level-crossing-removal-program

  124. Victorian auditor-general. "Follow-up level crossing removal report" (PDF). Archived (PDF) from the original on 1 November 2022. Retrieved 1 November 2022. https://www.parliament.vic.gov.au/file_uploads/20201014-Follow-up_level_crossing_removal_report_k2c4ZRcV.pdf

  125. Victorian auditor-general. "Follow-up level crossing removal report" (PDF). Archived (PDF) from the original on 1 November 2022. Retrieved 1 November 2022. https://www.parliament.vic.gov.au/file_uploads/20201014-Follow-up_level_crossing_removal_report_k2c4ZRcV.pdf

  126. "Skyrail protest in Coburg | Hundreds of angry residents marched through Coburg to protest a Skyrail on the Upfield line through the northern suburbs. www.7plus.com.au/news #7News | By 7NEWS Melbourne | Facebook". www.facebook.com. Archived from the original on 6 November 2022. Retrieved 6 November 2022. https://www.facebook.com/7NEWSMelbourne/videos/skyrail-protest-in-coburg/1886776784746451/

  127. "Hundreds march down Melbourne highway in protest of Sky Rail construction". www.9news.com.au. 18 September 2016. Archived from the original on 6 November 2022. Retrieved 6 November 2022. https://www.9news.com.au/national/hundreds-march-down-melbourne-highway-in-protest-of-sky-rail-construction/fc8b264d-d437-4ca7-bed4-ac33079c6fff

  128. Willingham, Richard (4 September 2016). "Sky rail gets strong backing from voters". The Courier. Archived from the original on 4 December 2016. Retrieved 20 September 2022. http://www.theage.com.au/victoria/sky-rail-gets-strong-backing-from-voters-20160904-gr89nx.html

  129. Sakkal, Paul (12 May 2019). "More than a year on, has 'sky rail' turned suburbs into ghettos?". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/more-than-a-year-on-has-sky-rail-turned-suburbs-into-ghettos-20190509-p51lqm.html

  130. Cowie, Tom (16 April 2018). "New sky rail station opens – and residents are happy about it". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/new-sky-rail-station-opens-and-residents-are-happy-about-it-20180416-p4z9wx.html

  131. Landy, Sam; Johnston, Matt (20 October 2014). "Victorian state election 2014: Labor's key promises in detail". Herald Sun. Archived from the original on 14 November 2022. Retrieved 14 November 2022. https://www.heraldsun.com.au/news/victoria-state-election-2014/victorian-state-election-2014-labors-key-promises-in-detail/news-story/c905df37da58db80bce6016fc530c03d

  132. "Charman Road, Cheltenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/park-and-charman-roads-cheltenham

  133. "Lochiel Avenue, Edithvale". Victoria's Big Build. 21 June 2022. Archived from the original on 3 December 2022. Retrieved 11 December 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/lochiel-avenue-edithvale

  134. "Mascot Avenue, Bonbeach". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mascot-avenue-bonbeach

  135. Willingham, Richard (23 June 2015). "Three suburban train stations to be rebuilt underground: St Albans, Ginifer and Heatherdale". The Age. Archived from the original on 14 November 2022. Retrieved 14 November 2022. https://www.theage.com.au/national/victoria/three-suburban-train-stations-to-be-rebuilt-undergound-20150623-ghv0la.html

  136. Victoria’s Big Build (22 June 2022). "Burke Road, Glen Iris". Victoria’s Big Build. Archived from the original on 24 October 2022. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/burke-road-glen-iris

  137. Victoria’s Big Build (21 June 2022). "Centre Road, Bentleigh". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/centre-road-bentleigh

  138. Victoria’s Big Build (21 June 2022). "North Road, Ormond". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/north-road-ormond

  139. Victoria’s Big Build (21 June 2022). "McKinnon Road, McKinnon". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mckinnon-road-mckinnon

  140. Victoria’s Big Build (21 June 2022). "Furlong Road, St Albans". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/furlong-road-st-albans

  141. Victoria’s Big Build (21 June 2022). "Main Road, St Albans". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-road-st-albans

  142. Victoria’s Big Build (21 June 2022). "Mountain Highway, Bayswater". Victoria’s Big Build. Archived from the original on 24 February 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mountain-highway-bayswater

  143. Victoria’s Big Build (21 June 2022). "Scoresby Road, Bayswater". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/scoresby-road-bayswater

  144. "Blackburn Road, Blackburn". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/blackburn-road-blackburn

  145. "Heatherdale Road, Mitcham". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/heatherdale-road-mitcham

  146. "Camp Road, Campbellfield". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/camp-road-campbellfield

  147. Victoria’s Big Build (21 June 2022). "Melton Highway, Sydenham". Victoria’s Big Build. Archived from the original on 7 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/melton-highway-sydenham

  148. Victoria’s Big Build (21 June 2022). "Chandler Road, Noble Park". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/chandler-road-noble-park

  149. Victoria’s Big Build (21 June 2022). "Corrigan Road, Noble Park". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/corrigan-road-noble-park

  150. Victoria’s Big Build (21 June 2022). "Heatherton Road, Noble Park". Victoria’s Big Build. Archived from the original on 7 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/heatherton-road-noble-park

  151. Victoria’s Big Build (21 June 2022). "Centre Road, Clayton". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/centre-road-clayton

  152. Victoria’s Big Build (21 June 2022). "Clayton Road, Clayton". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/clayton-road-clayton

  153. Victoria’s Big Build (21 June 2022). "Grange Road, Alphington". Victoria’s Big Build. Archived from the original on 25 March 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/grange-road-alphington

  154. Victoria’s Big Build (21 June 2022). "Lower Plenty Road, Rosanna". Victoria’s Big Build. Archived from the original on 25 March 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/lower-plenty-road-rosanna

  155. Victoria’s Big Build (21 June 2022). "Grange Road, Carnegie". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/grange-road-carnegie

  156. Victoria’s Big Build (21 June 2022). "Koornang Road, Carnegie". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/koornang-road-carnegie

  157. Victoria’s Big Build (21 June 2022). "Murrumbeena Road, Murrumbeena". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/murrumbeena-road-murrumbeena

  158. Victoria’s Big Build (21 June 2022). "Poath Road, Hughesdale". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/poath-road-hughesdale

  159. Victoria’s Big Build (21 June 2022). "Skye/Overton Road, Frankston". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/skye-overton-road-frankston

  160. Victoria’s Big Build (21 June 2022). "Thompsons Road, Lyndhurst". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/thompsons-road-lyndhurst

  161. Victoria’s Big Build (21 June 2022). "Kororoit Creek Road, Williamstown North". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/kororoit-creek-road-williamstown-north

  162. Victoria’s Big Build (22 June 2022). "Abbotts Road, Dandenong South". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/abbotts-road-dandenong-south

  163. "Buckley Street, Essendon". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/buckley-street-essendon

  164. Victoria’s Big Build (21 June 2022). "Seaford Road, Seaford". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/seaford-road-seaford

  165. Victoria’s Big Build (21 June 2022). "Aviation Road, Laverton". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/aviation-road-laverton

  166. "High Street, Reservoir". engage.vic.gov.au. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://engage.vic.gov.au/lxrp-reservoir

  167. "Eel Race Road, Carrum". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/eel-race-road-carrum

  168. "Mascot Avenue, Bonbeach". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mascot-avenue-bonbeach

  169. "Station Street, Carrum". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/station-street-carrum

  170. "Toorak Road, Kooyong". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/toorak-road-kooyong

  171. Victoria’s Big Build (22 June 2022). "Balcombe Road, Mentone". Victoria’s Big Build. Archived from the original on 1 March 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/balcombe-road-mentone

  172. Victoria’s Big Build (22 June 2022). "Charman Road, Cheltenham". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/park-and-charman-roads-cheltenham

  173. Victoria’s Big Build (22 June 2022). "Charman Road, Cheltenham". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/park-and-charman-roads-cheltenham

  174. Victoria’s Big Build (22 June 2022). "Bell Street, Coburg". Victoria’s Big Build. Archived from the original on 9 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/bell-street-coburg

  175. Victoria’s Big Build (22 June 2022). "Moreland Road, Brunswick". Victoria’s Big Build. Archived from the original on 9 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/moreland-road-brunswick

  176. Victoria’s Big Build (24 May 2023). "Werribee Street, Werribee". Victoria’s Big Build. Archived from the original on 28 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/werribee-street-werribee

  177. Victoria’s Big Build (22 June 2022). "Cherry Street, Werribee". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/cherry-street-werribee

  178. Victoria’s Big Build (24 February 2023). "South Gippsland Highway, Dandenong South". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/south-gippsland-highway

  179. Victoria’s Big Build (21 June 2022). "Bondi Road, Bonbeach". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/bondi-road-bonbeach

  180. Victoria’s Big Build (21 June 2022). "Edithvale Road, Edithvale". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/edithvale-road-edithvale

  181. Victoria’s Big Build (21 June 2022). "Lochiel Avenue, Edithvale". Victoria’s Big Build. Archived from the original on 3 December 2022. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/lochiel-avenue-edithvale

  182. Victoria’s Big Build (24 February 2023). "Manchester Road, Mooroolbark". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/manchester-road-mooroolbark

  183. Victoria’s Big Build (24 February 2023). "Maroondah Highway, Lilydale". Victoria’s Big Build. Archived from the original on 1 March 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/maroondah-highway-lilydale

  184. Victoria’s Big Build (24 February 2023). "Ferguson Street, Williamstown". Victoria’s Big Build. Archived from the original on 24 October 2022. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/ferguson-street-williamstown

  185. Victoria’s Big Build (16 May 2023). "Clyde Road, Berwick". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/clyde-road-berwick

  186. "Hallam Road, Hallam". Victoria’s Big Build. 12 July 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/hallam-road-hallam

  187. "Bell Street, Preston". Victoria's Big Build. 15 September 2022. Archived from the original on 11 January 2023. Retrieved 11 December 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/bell-street-preston

  188. Victoria’s Big Build (12 April 2023). "Glenroy Road, Glenroy". Victoria’s Big Build. Archived from the original on 11 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/glenroy-road-glenroy

  189. "Andrews pledges 25 new level crossing removals in Melbourne". ABC News. 21 October 2018. Archived from the original on 31 October 2018. Retrieved 28 October 2018. https://www.abc.net.au/news/2018-10-21/new-melbourne-level-crossing-removals-to-include-sky-rail/10401896

  190. "Evans Road, Lyndhurst". Victoria’s Big Build. 22 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/evans-road-lyndhurst

  191. Victoria’s Big Build (22 June 2022). "Munro Street, Coburg". Victoria’s Big Build. Archived from the original on 9 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/munro-street-coburg

  192. Victoria’s Big Build (22 June 2022). "Reynard Street, Coburg". Victoria’s Big Build. Archived from the original on 9 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/reynard-street-coburg

  193. "Cardinia Road, Pakenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/cardinia-road-pakenham

  194. Victoria’s Big Build (21 June 2022). "Argyle Avenue, Chelsea". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/argyle-avenue-chelsea

  195. Victoria’s Big Build (21 June 2022). "Chelsea Road, Chelsea". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/chelsea-road-chelsea

  196. Victoria’s Big Build (21 June 2022). "Swanpool Avenue, Chelsea". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/swanpool-avenue-chelsea

  197. Victoria’s Big Build (24 February 2023). "Old Geelong Road, Hoppers Crossing". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/old-geelong-road-hoppers-crossing

  198. Victoria’s Big Build (21 June 2022). "Greens Road, Dandenong South". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/greens-road-dandenong-south

  199. "Cramer Street, Preston". Victoria’s Big Build. 6 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/cramer-street-preston

  200. "Murray Road, Preston". Victoria’s Big Build. 6 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/murray-road-preston

  201. Victoria’s Big Build (14 April 2023). "Oakover Road, Preston". Victoria’s Big Build. Archived from the original on 1 April 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/oakover-road-preston

  202. Victoria’s Big Build (7 July 2023). "Fitzgerald Road, Ardeer". Victoria’s Big Build. Archived from the original on 10 July 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/fitzgerald-road-ardeer

  203. Victoria’s Big Build (7 July 2023). "Robinsons Road, Deer Park". Victoria’s Big Build. Archived from the original on 10 July 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/robinsons-road-deer-park

  204. Victoria’s Big Build (12 April 2023). "Gap Road, Sunbury". Victoria’s Big Build. Archived from the original on 21 March 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/gap-road-sunbury

  205. Victoria’s Big Build (26 July 2023). "Mt Derrimut Road, Deer Park". Victoria’s Big Build. Archived from the original on 10 July 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mt-derrimut-road-deer-park

  206. "Mont Albert Road, Mont Albert". Victoria’s Big Build. 3 August 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mont-albert-road-mont-albert

  207. "Mont Albert Road, Mont Albert". Victoria’s Big Build. 3 August 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mont-albert-road-mont-albert

  208. "Neerim Road, Glen Huntly". Victoria’s Big Build. 28 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/neerim-road-glen-huntly

  209. "Glen Huntly Road, Glen Huntly". Victoria’s Big Build. 28 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/glen-huntly-road-glen-huntly

  210. Victoria’s Big Build (11 December 2023). "Camms Road, Cranbourne". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 12 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/camms-road-cranbourne

  211. "Main Street, Pakenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 9 December 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-street-pakenham

  212. "McGregor Road, Pakenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mcgregor-road-pakenham

  213. "Racecourse Road, Pakenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/racecourse-road-pakenham

  214. Webster Street will be closed to vehicle traffic at the level crossing in 2025 with a new nearby road underpass completed by 2026.

  215. "Webster Street, Dandenong". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/webster-street-dandenong

  216. "Early works underway at Webster Street, Dandenong". levelcrossingremovalproject.cmail19.com. Retrieved 20 February 2025. https://levelcrossingremovalproject.cmail19.com/t/r-e-thjjhya-bktiliuhdt-y/

  217. "10 more level crossings to go by 2025". levelcrossings.vic.gov.au. 29 July 2021. Archived from the original on 30 July 2021. Retrieved 30 July 2021. https://levelcrossings.vic.gov.au/media/news/10-more-level-crossings-to-go-by-2025

  218. "10 more level crossings to go by 2025". levelcrossings.vic.gov.au. 29 July 2021. Archived from the original on 30 July 2021. Retrieved 30 July 2021. https://levelcrossings.vic.gov.au/media/news/10-more-level-crossings-to-go-by-2025

  219. "Webb Street, Narre Warren". Victoria’s Big Build. 7 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/webb-street-narre-warren

  220. "Cave Hill Road, Lilydale". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/cave-hill-road-lilydale

  221. "Bedford Road, Ringwood". Victoria’s Big Build. 29 August 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/bedford-road-ringwood

  222. "Brunt Road, Beaconsfield". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunt-road-beaconsfield

  223. "Keon Parade, Reservoir". Victoria’s Big Build. 9 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/keon-parade-reservoir

  224. "Station Street, Officer". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/station-street-officer

  225. "Dublin Road, Ringwood East". Victoria’s Big Build. 29 August 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/dublin-road-ringwood-east

  226. "Coolstore Road, Croydon". Victoria’s Big Build. 7 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/coolstore-road-croydon

  227. Victoria’s Big Build (22 November 2023). "Warrigal Road, Mentone". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 13 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/warrigal-road-mentone

  228. "Parkers Road, Parkdale". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/parkers-road-parkdale

  229. "Station Street, Beaconsfield". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/station-street-beaconsfield

  230. Victoria’s Big Build (24 March 2025). "Station Street, Beaconsfield makes for 85 level crossings gone for good". Victoria’s Big Build. Retrieved 24 March 2025. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/station-street-beaconsfield-makes-for-85-level-crossings-gone-for-good

  231. "Progress Street, Dandenong South". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/progress-street-dandenong-south

  232. Victoria’s Big Build (3 May 2024). "Piling works underway at Progress Street". Victoria’s Big Build. Retrieved 3 May 2024. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/piling-works-underway-at-progress-street

  233. Victoria’s Big Build (5 May 2025). "Major works set to kick off to get rid of Progress Street level crossing". Victoria’s Big Build. Retrieved 6 May 2025. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/major-works-progress-street

  234. "Calder Park Drive, Calder Park". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/calder-park-drive-calder-park

  235. "Holden Road, Calder Park". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/holden-road-calder-park

  236. Eddie, Rachael Dexter, Rachel (19 September 2022). "Eight level crossings to be removed in Melbourne's north". The Age. Archived from the original on 19 September 2022. Retrieved 19 September 2022.{{cite web}}: CS1 maint: multiple names: authors list (link) https://www.theage.com.au/politics/victoria/eight-level-crossings-to-be-removed-in-melbourne-s-north-20220919-p5bj6c.html

  237. "Victorian opposition pledges to cap public transport fares at $2 a day". ABC News. 9 October 2022. Archived from the original on 9 October 2022. Retrieved 9 October 2022. https://www.abc.net.au/news/2022-10-09/victorian-election-promises-2-dollar-public-transport/101516028

  238. "Eight More Dangerous Level Crossings To Go By 2027 | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 19 September 2022. Retrieved 19 September 2022. http://www.premier.vic.gov.au/eight-more-dangerous-level-crossings-go-2027

  239. "Level Crossing Removal Project". Victoria’s Big Build. 19 September 2022. Archived from the original on 21 September 2022. Retrieved 9 October 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project

  240. "Making Macleod level crossing-free". Victoria’s Big Build. 25 October 2022. Archived from the original on 25 October 2022. Retrieved 25 October 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/making-macleod-level-crossing-free

  241. Victoria’s Big Build (10 October 2023). "Old Calder Highway, Diggers Rest". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/diggers-rest

  242. "Site establishment works continue in Diggers Rest". levelcrossingremovalproject.cmail20.com. Retrieved 31 May 2024. https://levelcrossingremovalproject.cmail20.com/t/r-e-tdptuhy-bktiliuhdt-y/

  243. Victoria’s Big Build (21 May 2025). "Surface laid as bridge work enters home straight". Victoria’s Big Build. Retrieved 22 May 2025. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/surface-laid-as-bridge-work-enters-home-straight

  244. Victoria’s Big Build (10 October 2023). "Old Calder Highway, Diggers Rest". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/diggers-rest

  245. "Site establishment works continue in Diggers Rest". levelcrossingremovalproject.cmail20.com. Retrieved 31 May 2024. https://levelcrossingremovalproject.cmail20.com/t/r-e-tdptuhy-bktiliuhdt-y/

  246. Victoria’s Big Build (2 October 2023). "Maddox Road and Champion Road, Newport". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/newport

  247. Victoria’s Big Build (14 January 2025). "Site investigations continue in Newport". Victoria’s Big Build. Retrieved 15 January 2025. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/site-investigations-continue-in-newport

  248. Victoria’s Big Build (27 November 2023). "Melton level crossing removals". Victoria’s Big Build. Archived from the original on 5 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/melton

  249. Victoria’s Big Build (2 December 2024). "Melton Line level crossing removals kick off". Victoria’s Big Build. Retrieved 2 December 2024. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/melton-line-level-crossing-removals-kick-off

  250. Victoria’s Big Build (27 November 2023). "Melton level crossing removals". Victoria’s Big Build. Archived from the original on 5 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/melton

  251. Victoria’s Big Build (2 December 2024). "Melton Line level crossing removals kick off". Victoria’s Big Build. Retrieved 2 December 2024. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/melton-line-level-crossing-removals-kick-off

  252. Victoria’s Big Build (27 November 2023). "Melton level crossing removals". Victoria’s Big Build. Archived from the original on 5 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/melton

  253. Victoria’s Big Build (2 December 2024). "Melton Line level crossing removals kick off". Victoria’s Big Build. Retrieved 2 December 2024. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/melton-line-level-crossing-removals-kick-off

  254. Victoria’s Big Build (27 November 2023). "Melton level crossing removals". Victoria’s Big Build. Archived from the original on 5 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/melton

  255. Victoria’s Big Build (2 December 2024). "Melton Line level crossing removals kick off". Victoria’s Big Build. Retrieved 2 December 2024. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/melton-line-level-crossing-removals-kick-off

  256. Victoria’s Big Build (2 October 2023). "Maddox Road and Champion Road, Newport". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/newport

  257. Victoria’s Big Build (14 January 2025). "Site investigations continue in Newport". Victoria’s Big Build. Retrieved 15 January 2025. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/site-investigations-continue-in-newport

  258. Victoria’s Big Build (14 November 2023). "Mordialloc level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mordialloc

  259. Victoria’s Big Build (14 November 2023). "Mordialloc level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mordialloc

  260. Victoria’s Big Build (14 November 2023). "Mordialloc level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mordialloc

  261. Victoria’s Big Build (24 February 2023). "Ruthven Street, Macleod". Victoria’s Big Build. Archived from the original on 25 March 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/ruthven-street-macleod

  262. Victoria’s Big Build (10 January 2025). "Boots on the ground at Ruthven Street, Macleod". Victoria’s Big Build. Retrieved 15 January 2025. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/boots-on-the-ground-at-ruthven-street-macleod

  263. Laverton station is the closest station on the Werribee line express route to the Maidstone Street level crossing. The closest station geographically is Westona station located south of the level crossing on the Altona Loop. /wiki/Laverton_railway_station,_Melbourne

  264. Victoria’s Big Build (2 August 2023). "Maidstone Street, Altona". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/maidstone-street-altona

  265. Victoria’s Big Build (24 February 2023). "Werribee Line level crossing removals". Victoria’s Big Build. Archived from the original on 27 October 2022. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/werribee

  266. Victoria’s Big Build (7 March 2023). "Seaford level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/seaford

  267. Victoria’s Big Build (7 September 2023). "Frankston Line level crossing removals". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/frankston

  268. Victoria’s Big Build (7 September 2023). "Frankston Line level crossing removals". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/frankston

  269. Victoria’s Big Build (7 September 2023). "Frankston Line level crossing removals". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/frankston

  270. Victoria’s Big Build (7 March 2023). "Seaford level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/seaford

  271. Victoria’s Big Build (7 September 2023). "Frankston Line level crossing removals". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/frankston

  272. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  273. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  274. Victoria’s Big Build (24 February 2023). "Werribee Line level crossing removals". Victoria’s Big Build. Archived from the original on 27 October 2022. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/werribee

  275. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  276. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  277. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  278. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  279. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  280. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  281. Carey, Adam (15 November 2016). "Hawkstowe is go: Third train station announced for Mernda rail extension". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/hawkstowe-is-go-third-train-station-announced-for-mernda-rail-extenstion-20161115-gspb8i.html

  282. Boseley, Matilda (1 April 2018). "Mernda train line ahead of schedule". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/national/victoria/mernda-train-line-ahead-of-schedule-20180401-p4z7by.html

  283. "Pakenham East Station location fact sheet". Victoria’s Big Build. 19 June 2022. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://bigbuild.vic.gov.au/library/level-crossing-removal-project/pakenham/pakenham/community-updates-and-fact-sheets/pakenham-east-station-fact-sheet

  284. Carton, Donna (24 November 2017). "Southland Station finally ready to open this Sunday". Herald Sun Leader. https://www.heraldsun.com.au/leader/inner-south/southland-station-finally-ready-to-open-this-sunday/news-story/dcf6efbe7ff1249510bbe9b8c0fc0d7d

  285. "A 'Union' of 2 communities and more open space in the heart of Union Road". Victoria’s Big Build. 28 March 2022. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/a-union-of-2-communities-and-more-open-space

  286. Abbott, Lachlan (17 August 2022). "Barred from their own street, residents fume at handling of level crossing works". The Age. Archived from the original on 20 September 2022. Retrieved 20 September 2022. https://www.theage.com.au/politics/victoria/barred-from-their-own-street-residents-fume-at-handling-of-level-crossing-works-20220817-p5ban1.html

  287. Victoria’s Big Build (22 June 2022). "Burke Road, Glen Iris". Victoria’s Big Build. Archived from the original on 24 October 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/burke-road-glen-iris

  288. Victoria’s Big Build (21 June 2022). "McKinnon Road, McKinnon". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mckinnon-road-mckinnon

  289. Victoria’s Big Build (21 June 2022). "Centre Road, Bentleigh". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/centre-road-bentleigh

  290. Victoria’s Big Build (21 June 2022). "North Road, Ormond". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/north-road-ormond

  291. Victoria’s Big Build (21 June 2022). "Furlong Road, St Albans". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/furlong-road-st-albans

  292. Victoria’s Big Build (21 June 2022). "Main Road, St Albans". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-road-st-albans

  293. Victoria’s Big Build (21 June 2022). "Mountain Highway, Bayswater". Victoria’s Big Build. Archived from the original on 24 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mountain-highway-bayswater

  294. Victoria’s Big Build (21 June 2022). "Heatherdale Road, Mitcham". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/heatherdale-road-mitcham

  295. "Southland Station Set For A Festive Opening". Premier of Victoria. 22 October 2017. Archived from the original on 7 November 2017. Retrieved 31 October 2017. https://www.premier.vic.gov.au/southland-station-set-for-a-festive-opening/

  296. Victoria’s Big Build (21 June 2022). "Heatherton Road, Noble Park". Victoria’s Big Build. Archived from the original on 7 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/heatherton-road-noble-park

  297. Victoria’s Big Build (21 June 2022). "Clayton Road, Clayton". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/clayton-road-clayton

  298. Victoria’s Big Build (21 June 2022). "Lower Plenty Road, Rosanna". Victoria’s Big Build. Archived from the original on 25 March 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/lower-plenty-road-rosanna

  299. Victoria’s Big Build (21 June 2022). "Koornang Road, Carnegie". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/koornang-road-carnegie

  300. "Frankston Station Precinct Redevelopment". economicdevelopment.vic.gov.au. Archived from the original on 11 November 2017. Retrieved 5 January 2018. http://economicdevelopment.vic.gov.au/transport/rail-and-roads/public-transport/frankston-station-precinct-redevelopment

  301. Victoria’s Big Build (21 June 2022). "Murrumbeena Road, Murrumbeena". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/murrumbeena-road-murrumbeena

  302. Victoria’s Big Build (21 June 2022). "Poath Road, Hughesdale". Victoria’s Big Build. Archived from the original on 24 October 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/poath-road-hughesdale

  303. Victoria’s Big Build (25 January 2021). "Mernda Rail Extension". Victoria’s Big Build. Archived from the original on 27 February 2021. Retrieved 2 December 2023. https://levelcrossings.vic.gov.au/projects/mernda-rail-extension-project

  304. Victoria’s Big Build (25 January 2021). "Mernda Rail Extension". Victoria’s Big Build. Archived from the original on 27 February 2021. Retrieved 2 December 2023. https://levelcrossings.vic.gov.au/projects/mernda-rail-extension-project

  305. Victoria’s Big Build (25 January 2021). "Mernda Rail Extension". Victoria’s Big Build. Archived from the original on 27 February 2021. Retrieved 2 December 2023. https://levelcrossings.vic.gov.au/projects/mernda-rail-extension-project

  306. Victoria’s Big Build (14 April 2023). "High Street, Reservoir". Victoria’s Big Build. Archived from the original on 1 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/high-street-reservoir

  307. Victoria’s Big Build (21 June 2022). "Station Street, Carrum". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/station-street-carrum

  308. Victoria's Big Build (21 June 2022). "Balcombe Road, Mentone". Victoria's Big Build. Archived from the original on 1 March 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/balcombe-road-mentone

  309. Victoria’s Big Build (22 June 2022). "Charman Road, Cheltenham". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/park-and-charman-roads-cheltenham

  310. Victoria’s Big Build (22 June 2022). "Bell Street, Coburg". Victoria’s Big Build. Archived from the original on 9 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/bell-street-coburg

  311. Victoria’s Big Build (22 June 2022). "Moreland Road, Brunswick". Victoria’s Big Build. Archived from the original on 9 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/moreland-road-brunswick

  312. Victoria’s Big Build (16 June 2022). "Your new Lilydale Station". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/library/level-crossing-removal-project/lilydale/manchester-maroondah/fact-sheets/your-new-lilydale-station

  313. Victoria’s Big Build (24 February 2023). "Manchester Road, Mooroolbark". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/manchester-road-mooroolbark

  314. Victoria’s Big Build (21 June 2022). "Bondi Road, Bonbeach". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/bondi-road-bonbeach

  315. Victoria’s Big Build (21 June 2022). "Chelsea Road, Chelsea". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/chelsea-road-chelsea

  316. Victoria’s Big Build (21 June 2022). "Edithvale Road, Edithvale". Victoria’s Big Build. Archived from the original on 25 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/edithvale-road-edithvale

  317. Victoria’s Big Build (24 February 2023). "Ferguson Street, Williamstown". Victoria’s Big Build. Archived from the original on 24 October 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/ferguson-street-williamstown

  318. "Merinda Park Station Precinct | Cranbourne Line Upgrade". Engage Victoria. Archived from the original on 1 March 2023. Retrieved 2 December 2023. https://engage.vic.gov.au/project/lxrp-cranbourne-line-upgrade/page/merinda-park-station-precinct

  319. Victoria’s Big Build (26 October 2022). "Hallam Road, Hallam". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/hallam-road-hallam

  320. Victoria’s Big Build (12 April 2023). "Glenroy Road, Glenroy". Victoria’s Big Build. Archived from the original on 11 April 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/glenroy-road-glenroy

  321. Victoria’s Big Build (6 September 2023). "Happy 1st birthday to the new Preston and Bell stations". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/happy-1st-birthday-to-the-new-preston-and-bell-stations

  322. Victoria’s Big Build (6 September 2023). "Happy 1st birthday to the new Preston and Bell stations". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/happy-1st-birthday-to-the-new-preston-and-bell-stations

  323. Victoria’s Big Build (26 July 2023). "Mt Derrimut Road, Deer Park". Victoria’s Big Build. Archived from the original on 10 July 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mt-derrimut-road-deer-park

  324. Victoria’s Big Build (16 March 2023). "Montmorency upcoming major works in March and April". Victoria’s Big Build. Archived from the original on 2 December 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/library/level-crossing-removal-project/rail/hurstbridge/works/montmorency-upcoming-major-works-in-march-and-april

  325. Victoria’s Big Build (29 May 2023). "Union Road, Surrey Hills". Victoria’s Big Build. Archived from the original on 18 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/union-road-surrey-hills

  326. Victoria’s Big Build (29 May 2023). "Union Road, Surrey Hills". Victoria’s Big Build. Archived from the original on 18 February 2023. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/union-road-surrey-hills

  327. Victoria’s Big Build (25 September 2023). "Glen Huntly Road, Glen Huntly". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 2 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/glen-huntly-road-glen-huntly

  328. "Webb Street, Narre Warren". Victoria’s Big Build. 7 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/webb-street-narre-warren

  329. "Racecourse Road, Pakenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/racecourse-road-pakenham

  330. "Main Street, Pakenham". Victoria’s Big Build. 22 June 2022. Archived from the original on 9 December 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-street-pakenham

  331. "Keon Parade, Reservoir". Victoria’s Big Build. 9 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/keon-parade-reservoir

  332. "Dublin Road, Ringwood East". Victoria’s Big Build. 29 August 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/dublin-road-ringwood-east

  333. "Parkers Road, Parkdale". Victoria’s Big Build. 21 June 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/parkers-road-parkdale

  334. "Coolstore Road, Croydon". Victoria’s Big Build. 7 September 2022. Archived from the original on 20 September 2022. Retrieved 19 September 2022. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/coolstore-road-croydon

  335. Victoria’s Big Build (27 November 2023). "Melton level crossing removals". Victoria’s Big Build. Archived from the original on 5 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/melton

  336. Victoria’s Big Build (2 December 2024). "Melton Line level crossing removals kick off". Victoria’s Big Build. Retrieved 2 December 2024. https://bigbuild.vic.gov.au/news/level-crossing-removal-project/melton-line-level-crossing-removals-kick-off

  337. Victoria’s Big Build (14 November 2023). "Mordialloc level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mordialloc

  338. Victoria’s Big Build (24 February 2023). "Werribee Line level crossing removals". Victoria’s Big Build. Archived from the original on 27 October 2022. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/werribee

  339. Victoria’s Big Build (7 September 2023). "Frankston Line level crossing removals". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/frankston

  340. Victoria’s Big Build (7 September 2023). "Frankston Line level crossing removals". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/frankston

  341. Victoria’s Big Build (7 March 2023). "Seaford level crossings". Victoria’s Big Build. Archived from the original on 4 December 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/seaford

  342. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  343. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick

  344. Victoria’s Big Build (4 October 2023). "Brunswick and Parkville". Victoria’s Big Build. Archived from the original on 8 April 2023. Retrieved 1 December 2023. https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/brunswick