Menu
Home Explore People Places Arts History Plants & Animals Science Life & Culture Technology
On this page
Lowell Line
Branch of the MBTA Commuter Rail

The Lowell Line is a commuter rail service of the MBTA Commuter Rail system, running north–south between Boston and Lowell, Massachusetts. It is 25.4 miles (40.9 km) long, with nine stations including the terminals at North Station and Lowell station. All stations are accessible except for Mishawum, which has been indefinitely closed since 2020.

Lowell Line service runs on the New Hampshire Main Line, originally built as the Boston and Lowell Railroad in 1835. It was leased by the Boston and Maine Railroad in 1887. Local service operated between Boston and Concord, New Hampshire, with most trains using the Woburn Loop. The final Concord service ended in 1967 during the transition to Massachusetts Bay Transportation Authority subsidization, leaving Lowell–Boston and Woburn–Boston service. Concord service briefly resumed in 1980–81; Woburn service ended in 1981.

Related Image Collections Add Image
We don't have any YouTube videos related to Lowell Line yet.
We don't have any PDF documents related to Lowell Line yet.
We don't have any Books related to Lowell Line yet.
We don't have any archived web articles related to Lowell Line yet.

History

Boston and Lowell Railroad

The Boston and Lowell Railroad started freight operations in 1835, with traffic from the Lowell mills to the Boston port. Demand for the express passenger service exceeded expectations, and in 1842 local service was added as well. The line north of Lowell was first owned by the Boston, Concord & Montreal Railroad, which was chartered in 1844. Trackage was completed as far as Wells River, Vermont, in 1853. The Boston & Maine Railroad (B&M) acquired the railroad in 1895.12 The line served as the route for Boston to Montreal service during the Golden Age of Rail (roughly 1880 to 1940). The Ambassador, the train from Boston's North Station to Montreal, ran through Concord, New Hampshire, along this line until 1966.3 This line, along with the New Englander, via Concord, White River Junction, Montpelier, ran through the northwestern section of Vermont prior to entering Quebec, Canada. The Alouette and Red Wing trains travelled to Montreal via Concord, Plymouth, Wells River and Newport in northeastern Vermont prior to entering Quebec. (The route via Wells River, St. Johnsbury and Newport was the more direct route of the two itineraries.)4 For this itinerary the Montreal route was marketed as an Air-line railroad.

Massive cutbacks on May 18, 1958, included the end of Stoneham Branch service and the closure of Medford Hillside, Tufts College, and North Somerville stations.5 Cuts on June 14, 1959, ended service north of Woburn on the Woburn Loop; trains for points north were rerouted via the mainline to the east. Boston–Lowell local service was halved to seven daily round trips; Tyngsboro, Bleachery, and South Wilmington stations were closed.67 B&M passenger service to Boston on the line was shortened from Concord, New Hampshire, to Lowell in 1967.8

MBTA era

In 1973, the MBTA bought the Lowell line, along with the Haverhill and all other local Greater Boston passenger lines. Along with the sale, the B&M contracted to run the passenger service on the Lowell line for the MBTA. After bankruptcy, the B&M continued to run and fulfill its commuter rail contract under the protection of the United States Bankruptcy Court, in the hopes that a reorganization could make it profitable again. It emerged from the court's protection when newly formed Guilford Transportation Industries (GTI) purchased it in 1983.

For approximately thirteen months in 1980–81, daily passenger service was provided to Concord. Two round-trips were operated on each weekday and one on weekend days. Originally, there were intermediate stops in Manchester and Nashua. A stop in Merrimack was added later. Service was discontinued when federal funding was withdrawn.9

Anderson Regional Transportation Center opened on April 28, 2001, replacing Mishawum as the Lowell Line's primary park-and-ride station for Route 128. Mishawum was reduced to limited reverse-peak service.10 On December 15, 2001, the Amtrak Downeaster began operating over the line south of Wilmington.11 In October 2006, the MBTA added four short turn round trips that terminated at Anderson RTC.12 The line was shut down on weekends in July through September 2017 for the installation of Positive Train Control equipment in order to meet a 2020 federal deadline.13

Substantially reduced schedules due to the COVID-19 pandemic were in effect from March 16 to June 23, 2020, and from December 14, 2020, to April 5, 2021.14 On January 23, 2021, reduced schedules went into place with no weekend service on seven lines, including the Lowell Line.15 Weekend service on the seven lines resumed on July 3, 2021.16 As of February 2022[update], the line has 21+1⁄2 round trips on weekdays and nine on weekends.17 By October 2022, the line had 6,485 daily riders – 59% of pre-COVID ridership.18 In June 2022, the MBTA indicated it was considering improvements to a siding in Woburn, which would allow 30-minute headways between Boston and Anderson/Woburn by 2024.19

Until December 2020, a small number of Haverhill Line trains ran via the Wildcat Branch and the inner Lowell Line, making stops between Anderson/Woburn and West Medford.2021 Some Haverhill Line trains resumed using this routing on April 5, 2021, but no longer make stops on the Lowell Line.2223 From September 9 to November 5, 2023, all outer Haverhill Line service was routed over the Wildcat Branch during signal work on the inner part of the Haverhill Line. The diverted trains stopped only at Anderson/Woburn.24 From May 20 to September 29, 2024, weekday midday inbound Haverhill Line trains were temporarily routed over the Wildcat Branch during construction work, again stopping only at Anderson/Woburn.252627

The Medford Branch of the Green Line Extension, which opened on December 12, 2022, runs along the Lowell Line through Somerville and part of Medford. There are five Green Line stations on the branch, but no additional commuter rail stops were added.28

Proposed expansion to New Hampshire

MBTA Commuter Rail service connecting Concord, Manchester and Nashua from the Lowell Line used to exist in New Hampshire until subsidies were ceased in 1967.29 The service came back in 1980 for a quick 13 month return, but the program grant was cut by the Reagan administration in 1981, and commuter rail service has remained not available.30 In October 2010, the New Hampshire Department of Transportation received a $2.24 million federal grant to study an extension of the Lowell Line to Concord.31 In January 2011, a bill was introduced into the New Hampshire legislature to end the proposed extension and give up a potential $4.1 million grant into its planning.32 The MBTA acquired trackage rights from Pan Am in May 2011 as part of a larger transaction.33

The project was estimated to cost $246 million in a 2014 NHDOT report.34 Extending service to NH was projected to provide an expected 34 trains a day to Nashua and 16 a day to Manchester, connecting commuters from Nashua to Boston as low as 54 minutes and commuters from Manchester to Boston in as low as 1 hour and 25 minutes with 3,120 passengers a day.3536 Proponents of the extension see expanded rail services as a link to Boston’s growing economy while opponents consider the project to be extraneous and expensive.3738

In December 2020, a $5.5 million contract was awarded to AECOM for preliminary engineering and design work, environmental and public engagement services, and final design, for the project to extend MBTA commuter rail service to southern New Hampshire.39 The project called for the extension of the Lowell Line up through Nashua and Manchester along an existing rail alignment.404142 The proposed expansion would include four new stops: South Nashua, Crown Street in Nashua, Bedford, and Manchester.43 In January of 2022, the Manchester Board of Mayor and Aldermen approved the location for new facilities to house layover trains adjacent to the Manchester Transit Authority facilities.44

By autumn 2022, the study was being carried out by AECOM and the State of New Hampshire to design and make a financial plan for the project by 2023. In December 2022, the New Hampshire Executive Council voted to cease state funding for an extension of the AECOM study; the study reported an updated project cost of $782 million.45464748 As of 2025, corridor planning for the extension has been indefinitely postponed.495051

Operations

Track speeds

North of Wilmington, the line is authorized for a maximum of 60 miles per hour (97 km/h). South of Wilmington, the line has an unusual asymmetrical speed limit. The northbound track supports up to 70 miles per hour (110 km/h) where curvature allows, while the southbound track has a maximum of 60 miles per hour (97 km/h). Additional speed restrictions are in place at Wilmington, through the grade crossings in West Medford, and in the North Station terminal area.52

Other services

Amtrak's Downeaster service to Maine, along with some Haverhill Line express trains, run on the Lowell Line from North Station to Wilmington, then follow the Wildcat Branch to the Haverhill Line. This routing is used to avoid the inner Haverhill Line, which has a number of single-track sections.

The line is the designated freight clearance route into Boston from the north; all stations with high-level platforms must either have mini-high platforms or a freight passing track. Pan Am Railways runs freight on the line, including local freights based out of Lawrence Yard and DOBO (a Dover to Boston through freight).

Station listing

StateFare zoneLocationMiles (km)535455StationConnections and notes
MA1ABoston0.0 (0.0) North Station Amtrak: Downeaster MBTA Commuter Rail: Fitchburg Line, Haverhill Line, Newburyport/Rockport Line MBTA subway: Orange Line, Green Line (D and E branches) MBTA bus: 4 EZRide
Somerville0.8 (1.3)Boston Engine TerminalFlag stop for MBTA employees only
Medford4.0 (6.4)Tufts UniversityOpen September 1977 to October 1979
5.5 (8.9) West Medford MBTA bus: 9495
1Winchester7.3 (11.7) Wedgemere
7.8 (12.6) Winchester Center MBTA bus: 134Former junction with Woburn Branch (closed 1981)
9.0 (14.5)Winchester HighlandsClosed June 197856
Woburn10.5 (16.9)Walnut HillClosed January 18, 196557
10.9 (17.5)Lechmere WarehouseOpen 1979 to 199658
211.6 (18.7)MishawumFlag stop with limited reverse commute service. Indefinitely closed on December 14, 2020.
12.7 (20.4) Anderson/Woburn Amtrak: Downeaster Logan Express
3Wilmington15.2 (24.5) Wilmington LRTA: 12Junction with the Wildcat Branch
17.0 (27.4)Silver LakeClosed January 18, 196559
Billerica19.2 (30.9)East BillericaClosed January 18, 196560
521.8 (35.1) North Billerica LRTA: 3, 13
6Lowell25.5 (41.0) Lowell LRTA: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 MVRTA: 24
Chelmsford28.7 (46.2)North ChelmsfordClosed June 30, 1967
NHNashua39.0 (62.8)NashuaClosed June 30, 1967; open from January 28, 1980 to March 1, 198161
Merrimack46.1 (74.2)MerrimackOpen from April 1980 to March 1, 198162
Manchester55.5 (89.3)ManchesterClosed June 30, 1967; open from January 28, 1980 to March 1, 198163
Concord73.3 (118.0)ConcordClosed June 30, 1967; open from January 28, 1980 to March 1, 198164
  Closed station

Woburn Branch

LocationMiles (km)656667StationConnections and notes
Winchester7.8 (12.6) Winchester CenterJunction with mainline
Woburn9.0 (14.5)Cross StreetClosed February 1, 198168
9.8 (15.8)WoburnClosed February 1, 198169
  Closed station
Wikimedia Commons has media related to MBTA Lowell Line. Template:Attached KML/Lowell LineKML is from Wikidata

References

  1. "Boston, Concord & Montreal Railroad waymark". Waymarking. 19 April 2007. Retrieved 23 August 2011. http://www.waymarking.com/waymarks/WM1ECR

  2. See also Boston and Maine Corporation#Acquisitions /wiki/Boston_and_Maine_Corporation#Acquisitions

  3. Mike Schafer, Classic American Trains, p. 31.

  4. "Map of the Montreal and Boston Air Line, Passumpsic, and South Eastern Railroads, and connections". David Rumsey Map Collection. Retrieved 23 August 2011. http://www.davidrumsey.com/luna/servlet/detail/RUMSEY~8~1~24521~900036:Map-of-the-Montreal-and-Boston-Air-

  5. Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 55–58. ISBN 9780685412947. 9780685412947

  6. Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 55–58. ISBN 9780685412947. 9780685412947

  7. "Cities, Towns, Labor Officials Protest State O.K. of B&M Cutbacks". Boston Globe. May 13, 1959. p. 6 – via Newspapers.com. https://www.newspapers.com/clip/71698391/the-boston-globe/

  8. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  9. Skoropowski, Eugene K. (1 August 2008). "N.H. commuter rail: a success in 1980". New Hampshire Business Review. Archived from the original on 6 August 2020. Retrieved 22 April 2024. https://www.nhbr.com/n-h-commuter-rail-a-success-in-1980/

  10. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  11. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  12. "Still plenty of parking at the Anderson lot in Woburn". Boston Globe. March 4, 2012. p. B3 – via Newspapers.com. https://www.newspapers.com/clip/44816524/the_boston_globe/

  13. "Commuter Rail Positive Train Control (PTC): Update and Communications Plan for Suspension of Weekend Service" (PDF). Massachusetts Bay Transportation Authority. March 27, 2017. p. 6. Archived from the original (PDF) on March 31, 2017. Retrieved March 30, 2017. https://web.archive.org/web/20170331205623/http://www.mbta.com/uploadedfiles/About_the_T/Board_Meetings/K.%20%20%20FINAL%20FMCB%20PTC%20WE%20Suspension%20Comm%20Plan%203-27-17.pdf

  14. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  15. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  16. Coholan, Ryan (May 24, 2021). "Commuter Rail Performance Update" (PDF). Massachusetts Bay Transportation Authority. p. 7. https://cdn.mbta.com/sites/default/files/2021-05/2021-05-24-fmcb-10-commuter-rail-performance-update.pdf

  17. Belcher, Jonathan (January–February 2022). "MBTA Vehicle Inventory as of February 28, 2022". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 17. /wiki/Boston_Street_Railway_Association

  18. Poftak, Steve (October 27, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. p. 6. https://cdn.mbta.com/sites/default/files/2022-10/GM%20Report%20to%20Board%2010.27.2022.pdf

  19. Sawers, Alistar (June 23, 2022). "Regional Rail Transformation Update: Traction Power Planning for Regional and Urban Rail Services" (PDF). Massachusetts Bay Transportation Authority. p. 17. https://mbta.com/sites/default/files/2022-06/10.%20Rail%20Transformation%20Technology%20Board%20Update%20v2.pdf

  20. "Lowell Line: Fall/Winter Schedule" (PDF). Massachusetts Bay Transportation Authority. November 2, 2020. Archived from the original (PDF) on November 30, 2020. https://web.archive.org/web/20201130015122mp_/https://cdn.mbta.com/sites/default/files/route_pdfs/2020-fall/2020-11-02-cr-lowell-accessible.pdf

  21. "2020/2021 Reduced Service Schedule: Lowell Line" (PDF). Massachusetts Bay Transportation Authority. December 14, 2020. https://cdn.mbta.com/sites/default/files/route_pdfs/2021-winter/2020-2021-cr-lowell-reduced-accessible.pdf

  22. "Haverhill Line 2021 Spring Schedule" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021. Archived from the original (PDF) on April 5, 2021. https://web.archive.org/web/20210405122058/https://cdn.mbta.com/sites/default/files/route_pdfs/2021-spring/2021-04-05-spring-haverhill-accessible.pdf

  23. "Lowell Line 2021 Spring Schedule" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021. Archived from the original (PDF) on April 23, 2021. https://web.archive.org/web/20210423161734/https://cdn.mbta.com/sites/default/files/route_pdfs/2021-spring/2021-04-05-spring-lowell-accessible.pdf

  24. "Service Disruption September 9 to November 5 on Haverhill Commuter Rail Line" (Press release). Massachusetts Bay Transportation Authority. August 10, 2023. https://www.mbta.com/news/2023-08-10/service-disruption-september-9-november-5-haverhill-commuter-rail-line

  25. "Haverhill Line Spring/Summer Schedule" (PDF). Massachusetts Bay Transportation Authority. May 20, 2024. Archived from the original (PDF) on May 21, 2024. https://web.archive.org/web/20240521000654/https://cdn.mbta.com/sites/default/files/media/route_pdfs/batch_7022/2024-05-20-cr-spring-summer-haverhill-line-schedule-accessible.pdf

  26. "June Service Changes: MBTA Continues Repair Work to Improve Reliability Across the System" (Press release). Massachusetts Bay Transportation Authority. May 20, 2024. https://www.mbta.com/news/2024-05-20/june-service-changes-mbta-continues-repair-work-improve-reliability-across-the

  27. "Alerts: Haverhill Line". Massachusetts Bay Transportation Authority. September 30, 2024. Archived from the original on September 30, 2024. https://web.archive.org/web/20240930205057/https://www.mbta.com/schedules/CR-Haverhill/alerts

  28. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  29. Skoropowski, Eugene K. (1 August 2008). "N.H. commuter rail: a success in 1980". New Hampshire Business Review. Archived from the original on 6 August 2020. Retrieved 22 April 2024. https://www.nhbr.com/n-h-commuter-rail-a-success-in-1980/

  30. Skoropowski, Eugene K. (1 August 2008). "N.H. commuter rail: a success in 1980". New Hampshire Business Review. Archived from the original on 6 August 2020. Retrieved 22 April 2024. https://www.nhbr.com/n-h-commuter-rail-a-success-in-1980/

  31. "Governor Patrick, Congressional Delegation Announce More than $160 Million In Federal Rail Grants" (Press release). Massachusetts Bay Transportation Authority. October 25, 2010. https://www.mbta.com/news/2010-10-25/governor-patrick-congressional-delegation-announce-more-160-million-federal-rail

  32. "New Hampshire Republicans plan to kill commuter line". Trains Magazine. 8 February 2011. Retrieved 9 February 2011. http://trn.trains.com/en/Railroad%20News/News%20Wire/2011/02/New%20Hampshire%20Republicans%20plan%20to%20kill%20commuter%20line.aspx

  33. "MassDOT Board Approves Agreement to Build New Lechmere Station, Crucial to Green Line Extension" (Press release). Massachusetts Bay Transportation Authority. May 3, 2011. https://www.mbta.com/news/2011-03-03/massdot-board-approves-agreement-build-new-lechmere-station-crucial-green-line

  34. Cronin, Mike (2021-11-18). "Commuter rail to New Hampshire debate returns after infrastructure bill signing". WMUR. Retrieved 2022-02-22. https://www.wmur.com/article/commuter-rail-new-hampshire-debate-returns-after-infrastructure-bill-signing/38285373

  35. NHDOT (Dec 2014). "State Project Numbers 16317 and 68067-A" (PDF). nh.gov. Archived from the original (PDF) on February 26, 2015. https://web.archive.org/web/20150226011308/https://www.nh.gov/dot/org/aerorailtransit/railandtransit/documents/fr-summary.pdf

  36. NHDOT (Apr 27, 2021). "Nashua-Manchester (Capitol Corridor) Project Development Phase" (PDF). snhpc.org. https://www.snhpc.org/sites/g/files/vyhlif5006/f/uploads/nhdot_briefing_snhpc_april_27_2021_final.pdf

  37. Leader, Josie Albertson-Grove New Hampshire Union (17 November 2021). "Commuter rail moving ahead, but planning on track through at least 2023". UnionLeader.com. Retrieved 2022-02-22. https://www.unionleader.com/commuter-rail-moving-ahead-but-planning-on-track-through-at-least-2023/article_a906c05c-13fb-52df-82a3-408f34214b1c.html

  38. "NH House to Debate Bill Protecting NH Taxpayers From Subsidizing New Rail Projects". NH Journal. 2022-01-13. Retrieved 2022-02-22. https://nhjournal.com/nh-house-to-debate-bill-protecting-nh-taxpayers-from-subsidizing-new-rail-projects/

  39. Kitch, Michael (December 22, 2020). "New Hampshire Executive Council OKs start of Capitol Corridor design". NH Business Review. https://www.nhbr.com/new-hampshire-executive-council-oks-start-of-capitol-corridor-design/

  40. NHDOT (Apr 27, 2021). "Nashua-Manchester (Capitol Corridor) Project Development Phase" (PDF). snhpc.org. https://www.snhpc.org/sites/g/files/vyhlif5006/f/uploads/nhdot_briefing_snhpc_april_27_2021_final.pdf

  41. "Aldermen support downtown rail station concept | Manchester Ink Link". manchesterinklink.com. August 4, 2021. https://manchesterinklink.com/aldermen-support-downtown-rail-station-concept/

  42. Cronin, Mike (2021-11-18). "Commuter rail to New Hampshire debate returns after infrastructure bill signing". WMUR. Retrieved 2022-02-22. https://www.wmur.com/article/commuter-rail-new-hampshire-debate-returns-after-infrastructure-bill-signing/38285373

  43. NHDOT (Apr 27, 2021). "Nashua-Manchester (Capitol Corridor) Project Development Phase" (PDF). snhpc.org. https://www.snhpc.org/sites/g/files/vyhlif5006/f/uploads/nhdot_briefing_snhpc_april_27_2021_final.pdf

  44. "Aldermen approve layover site for commuter rail line | Manchester Ink Link". manchesterinklink.com. 2022-01-19. Retrieved 2022-02-22. https://manchesterinklink.com/aldermen-approve-layover-site-for-commuter-rail-line/

  45. Wade, Christian (22 December 2022). "New Hampshire panel axes funding for regional commuter rail". The Center Square. Retrieved 2023-01-16. https://www.thecentersquare.com/massachusetts/new-hampshire-panel-axes-funding-for-regional-commuter-rail/article_3c4fd7a0-820d-11ed-aeda-8f3dd01034d9.html

  46. NHDOT (March 2023). "Capitol Corridor Commuter Rail Extension Project Winter 2023" (PDF). Archived from the original (PDF) on April 3, 2023. http://web.archive.org/web/20230403165232/https://www.nh.gov/dot/projects/nashuamanchester40818/documents/40818-info-sheets-winter-2023.pdf

  47. Landrigan, Kevin (February 26, 2023). "Boston to Manchester rail study: $782 million to build, $17 million a year to run". https://news.yahoo.com/boston-manchester-rail-study-782-045900583.html

  48. Winters, Shelley (March 8, 2023). "Pre-Decisional Draft for Information Purposes: Environmental Assessment, Nashua-Manchester, 40818 (Capitol Corridor Commuter Rail Extension)" (PDF). nh.gov. Archived from the original (PDF) on March 14, 2023. http://web.archive.org/web/20230314114744/https://www.nh.gov/dot/projects/nashuamanchester40818/documents/2023-03-08-40818-ea-memo-nhdot.pdf

  49. "COMMENTARY: Executive Council derails commuter rail". nashuatelegraph.com. Retrieved 2025-01-02. https://www.nashuatelegraph.com/news/local-news/2023/01/28/commentary-executive-council-derails-commuter-rail/

  50. Blanchard, Byline: Mya (2024-09-26). "Update on commuter rail exploration project » Nashua Ink Link". Retrieved 2025-01-02. https://nashua.inklink.news/update-on-commuter-rail-exploration-project/

  51. "New Hampshire State Rail Plan" (PDF). NHDOT. November 2023. https://mm.nh.gov/files/uploads/dot/remote-docs/railplan-rac1-20231101-final.pdf?utm_source=chatgpt.com

  52. Parsons Brinckerhoff Quade & Douglas (April 2003). "Boston to Montreal High-Speed Rail Planning and Feasibility Study Phase I: Final Report" (PDF). Vermont Agency of Transportation et al. Archived from the original (PDF) on 21 February 2006. Retrieved 8 July 2015. https://web.archive.org/web/20060221013655/http://www.bostonmontrealhsr.org/documents/Final_Repor_%20Boston-Montreal_HSR-Phase1.pdf

  53. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014. https://old.mbta.com/uploadedfiles/documents/2014%20BLUEBOOK%2014th%20Edition(1).pdf

  54. Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. pp. 282–288. ISBN 9780942147124. 9780942147124

  55. Held, Patrick R. (2010). "Massachusetts Bay Colony Railroad Track Charts" (PDF). Johns Hopkins Association for Computing Machinery. Archived from the original (PDF) on October 8, 2013. https://web.archive.org/web/20131008000656/http://acm.jhu.edu/~sthurmovik/movies/MBCR+Maps+%282010%29.pdf

  56. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  57. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  58. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  59. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  60. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  61. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  62. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  63. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  64. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  65. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014. https://old.mbta.com/uploadedfiles/documents/2014%20BLUEBOOK%2014th%20Edition(1).pdf

  66. Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. pp. 282–288. ISBN 9780942147124. 9780942147124

  67. Held, Patrick R. (2010). "Massachusetts Bay Colony Railroad Track Charts" (PDF). Johns Hopkins Association for Computing Machinery. Archived from the original (PDF) on October 8, 2013. https://web.archive.org/web/20131008000656/http://acm.jhu.edu/~sthurmovik/movies/MBCR+Maps+%282010%29.pdf

  68. "T changes start today". Boston Globe. February 1, 1981. p. 24 – via Newspapers.com. https://www.newspapers.com/clip/38328189/the_boston_globe/

  69. "T changes start today". Boston Globe. February 1, 1981. p. 24 – via Newspapers.com. https://www.newspapers.com/clip/38328189/the_boston_globe/