Menu
Home Explore People Places Arts History Plants & Animals Science Life & Culture Technology
On this page
Main Line for Europe
High-speed railway line

The Magistrale for Europe (German: Magistrale für Europa; French: Magistrale européenne) or Main Line for Europe is a Trans-European Transport Networks (TEN-T) project for the creation of a high-speed railway line between Paris and Bratislava, with a branch-off to Budapest. It was listed as TEN project No. 17 (Paris—Bratislava) by the European Commission in 1995, and is already under way.

The project was planned to be completed by 2020, however the entire project has not been delivered on time, with only some of the sections running. It will link 34 million people in five European countries. The overall length of the route from Paris to Budapest is 1,562 km (971 mi).

Related Image Collections Add Image
We don't have any YouTube videos related to Main Line for Europe yet.
We don't have any PDF documents related to Main Line for Europe yet.
We don't have any Books related to Main Line for Europe yet.
We don't have any archived web articles related to Main Line for Europe yet.

Sections

Parts of the route were formerly served by Orient Express trains, which ceased operations in 2009. Today TGV rail connections exist from Paris to Stuttgart or at longest Munich. The Austrian Federal Railways (ÖBB) currently provide direct Railjet and EuroNight connections between Munich and Budapest in addition to direct Nightjet connection between Vienna and Paris since December 2021.

France

The French part of the line is the LGV Est européenne high-speed railway. Its first section as far as Baudrecourt east of Metz has been in use since 2007 whilst the second section to Vendenheim near Strasbourg opened in July 2016.8 The new railway line provides a maximum speed up to 320 km/h (199 mph) and reduced the travel time from Gare de Paris-Est to the largely refurbished Gare de Strasbourg to 1h 45' .910

Germany

In Germany, the line follows the Appenweier–Strasbourg railway (Europabahn) from the Rhine Bridge to Appenweier and then the Mannheim–Karlsruhe–Basel railway (Rheintalbahn) down to Bruchsal. The Europabahn is built for a maximum speed of 200 km/h (124 mph), while the Rheintalbahn to Rastatt Süd is for 250 km/h (155 mph). The second part of the new Rheintalbahn (Rastatt Süd to Bruchsal) is to be completed by 2014[needs update]. At the Bruchsal Rollenberg junction the MoE joins the Mannheim–Stuttgart high-speed railway which was built for 250 km/h (155 mph). Stuttgart Hauptbahnhof is currently being rebuilt (scheduled for completion in 2025) as a through station in the course of the controversial Stuttgart 21 project.11 Despite some protests, a 2011 statewide referendum upheld the majority support and thus the political decision to rebuild the station and let the Magistrale for Europe project proceed.12

In Stuttgart, the line joins the Stuttgart–Augsburg new and upgraded railway (including the Stuttgart–Wendlingen and Wendlingen–Ulm high-speed railway lines replacing the Fils Valley Railway), which Wendlingen- Ulm section is completed at the end of 2022 and provides a maximum speed of 250 km/h (155 mph) between Stuttgart and Ulm and 200 km/h (124 mph) on the Ulm–Augsburg railway line. The Munich–Augsburg railway is being upgraded to separate slower traffic (freight and short-distance trains) from high speed trains, which will be able to reach 230 km/h (143 mph). From München-Pasing station trains may run directly to München Ost without passing München Hauptbahnhof. Plans for the reconstruction of the Munich main station similar to Stuttgart 21 have been abandoned.

Trains from München Ost shall reach Salzburg Hauptbahnhof via the upgraded Munich–Mühldorf railway, providing a maximum speed of 160 km/h (99 mph), and the Mühldorf–Freilassing railway line. In Freilassing the MoE joins the Rosenheim–Salzburg railway leading across the Austrian border including a new third track serving the Salzburg S-Bahn commuter network.

Austria

In Austria, the Western Railway line was extended to reduce travel time between Munich, Salzburg, Linz, and Vienna to one hour each. The section between the Attnang-Puchheim rail hub and Wels Hauptbahnhof near Linz was already upgraded until October 2012 to provide a maximum speed of 230 km/h (143 mph). Between Linz and Vienna a new parallel high-speed railway line (Neue Westbahn) for a maximum speed of 250 km/h (155 mph) was completed in 2015, including the Wienerwald Tunnel.

In Vienna, the former Südbahnhof terminal station was demolished and replaced by the new Wien Hauptbahnhof. From here, trains run on the Eastern Railway line to Bratislava-Petržalka railway station, including a connection to Vienna International Airport. East of Vienna, a southeastern branch-off leads via Győr to Budapest.

Route

SectionDistanceOpeningDuration before1Recent duration1Planned duration1
Paris–Strasbourg440.2 km13Paris–Baudrecourt 2007237 min (ø 127 km/h)105 min (ø 252 km/h)14-
Baudrecourt–Vendenheim 2016
Strasbourg–Karlsruhe81.6 km15a portion (Appenweier-Karlsruhe) is in use now40 min (ø 122 km/h)25 min (ø 194 km/h)
Karlsruhe–Stuttgart90 kmin use61 min (ø 89 km/h)35 min (ø 154 km/h)35 min (ø 154 km/h)
Stuttgart–Ulm25.2 kmStuttgart–Wendlingen high-speed railway 20251654 min (ø 104 km/h)1728 min (ø 174 km/h)18
60 km19Wendlingen–Ulm high-speed railway 202220
Ulm–Augsburg85 kmUlm–Augsburg railway upgrade 20252141 min (ø 126 km/h)26 min (ø 198 km/h)
Augsburg–Munich61 km201137 min (ø 99 km/h)18 min (ø 203 km/h)
Munich–Mühldorf–Salzburg(northern line, 155.3 km)85 kmMunich–Mühldorf upgrade87 min (ø 106 km/h)62 min (ø 148 km/h)
65 kmMühldorf–Freilassing upgrade
5 kmFreilassing–Salzburg upgrade 2009
Munich–Rosenheim–Salzburg(southern line, 153.5 km)65 kmMunich–Rosenheim upgrade? min (ø ? km/h)? min (ø ? km/h)
82 kmRosenheim–Freilassing upgrade
5 kmFreilassing–Salzburg upgrade 2009
Salzburg–Linz127 kmSalzburg–Attnang-Puchheim 201364 min (ø 119 km/h)60 min (ø 127 km/h)
Attnang-Puchheim–Wels 2011
Wels–Linz (Linz–Marchtrenk)22 2028
Linz–St. Pölten130 kmDoubling to 4 tracks 2024–20302348 min (ø 163 km/h)44 min (ø 177 km/h)
St.Pölten-Vienna44 km201241 min (ø 64 km/h)25 min (ø 106 km/h)
Vienna–Budapest263 km181 min (ø 87 km/h)
Vienna–Marchegg–Bratislava(northern line)65 kmMarchegger Ostbahn upgrade 20252425Bratislava–Marchegg railway line upgrade2665 min2757 min (ø 68 km/h)40 min28 (ø 111 km/h)
Vienna–Parndorf–Bratislava(southern line)80 km201355 min (ø 87 km/h)
total:
Paris–Budapest1562 km722 min (12:02)1 2 (ø 132 km/h)614 min (10:14)1 2 (ø 155 km/h)
Paris–Bratislava (northern line)1364 km598 min (9:58)1 2 (ø 140 km/h)468 min (7:40)1 2 (ø 178 km/h)
Paris–Bratislava (southern line)1379 km488 min (8:08)1 2 (ø 173 km/h)
Paris–Munich843 km484 min (8:04)1 2 (ø 108 km/h)317 min (5:17) 1 (ø 166 km/h)242 min (4:02) 1 (ø 216 km/h)

1 It is calculated with the fastest possible durations between the towns. 2 Real duration is longer due to changing. Source (unless stated otherwise): annual report 2006/07 of Péter Balázs

See also

  • Trains portal

References

  1. Bruinsma, Frank, ed. (2007). Railway Development: Impacts on Urban Dynamics. Heidelberg: Springer Science & Business Media. p. 72. ISBN 9783790819724. Retrieved 20 June 2020. 9783790819724

  2. Kaw, Jon Kher, ed. (2020). The Hidden Wealth of Cities: Creating, Financing, and Managing Public Spaces. Washington, D.C.: World Bank Publications. p. 98. ISBN 9781464814938. Retrieved 20 June 2020. 9781464814938

  3. Florian Fuchs and Claudia Henzler (24 October 2019). "Im Schneckentempo zur Schnellfahrstrecke". Süddeutsche Zeitung (in German). Retrieved 20 June 2020. https://www.sueddeutsche.de/bayern/augsburg-ulm-deutsche-bahn-ausbau-1.4652510

  4. Charles Gautier (24 March 2017). "Ces projets français réalisés grâce aux aides européennes". Le Figaro (in French). Retrieved 20 June 2020. https://www.lefigaro.fr/international/2017/03/24/01003-20170324ARTFIG00314-ces-projets-francais-realises-grace-aux-aides-europeennes.php

  5. "Main Line for Europe". MainLineforEurope.org. Retrieved 13 July 2024. https://mainlineforeurope.org/en/

  6. Bruinsma, Frank, ed. (2007). Railway Development: Impacts on Urban Dynamics. Heidelberg: Springer Science & Business Media. p. 72. ISBN 9783790819724. Retrieved 20 June 2020. 9783790819724

  7. "TEN-T priority axes and projects 2005" (PDF). Trans-European Transport Network. European Commission. 2005. (14.4 MB, axis No 17, p44) http://ec.europa.eu/ten/transport/projects/doc/2005_ten_t_en.pdf

  8. "Finanzierungsvereinbarung für 2. Phase der LGV Est unterzeichnet" (in German). Archived from the original on 2010-05-24. Retrieved 2011-07-16. https://web.archive.org/web/20100524184311/http://www.eurailpress.de/article/view/4/finanzierungsvereinbarung-fuer-2-phase-der-lgv-est-unterzeichnet.html

  9. Infos horaires train Paris-Strasbourg on the sncf-connect website (22 April 2025). https://www.sncf-connect.com/train/horaires/paris/strasbourg

  10. Charles Gautier (24 March 2017). "Ces projets français réalisés grâce aux aides européennes". Le Figaro (in French). Retrieved 20 June 2020. https://www.lefigaro.fr/international/2017/03/24/01003-20170324ARTFIG00314-ces-projets-francais-realises-grace-aux-aides-europeennes.php

  11. Kaw, Jon Kher, ed. (2020). The Hidden Wealth of Cities: Creating, Financing, and Managing Public Spaces. Washington, D.C.: World Bank Publications. p. 98. ISBN 9781464814938. Retrieved 20 June 2020. 9781464814938

  12. Kaw, Jon Kher, ed. (2020). The Hidden Wealth of Cities: Creating, Financing, and Managing Public Spaces. Washington, D.C.: World Bank Publications. p. 98. ISBN 9781464814938. Retrieved 20 June 2020. 9781464814938

  13. The length of the high-speed Paris-Strasbourg line is 440.2 km (22.703 km of classical line from Paris-Est to the junction with the LGV + 406 km LGV Est + 11.5 km from the Strasbourg station to the junction with the LGV), compared with 502 km for the classical line. /wiki/Paris-Est%E2%80%93Strasbourg-Ville_railway

  14. Infos horaires train Paris-Strasbourg on the sncf-connect website (22 April 2025). https://www.sncf-connect.com/train/horaires/paris/strasbourg

  15. 21.3 km Strasbourg - Appenweier Nord (Abzw) on the Appenweier–Strasbourg railway + 39.537 km Appenweier Nord (Abzw) - Rastatt on the Mannheim–Karlsruhe–Basel railway + 20.783 km Rastatt - Karlsruhe Hbf on the Rhine Railway. /wiki/Appenweier%E2%80%93Strasbourg_railway

  16. Florian Fuchs and Claudia Henzler (24 October 2019). "Im Schneckentempo zur Schnellfahrstrecke". Süddeutsche Zeitung (in German). Retrieved 20 June 2020. https://www.sueddeutsche.de/bayern/augsburg-ulm-deutsche-bahn-ausbau-1.4652510

  17. Florian Fuchs and Claudia Henzler (24 October 2019). "Im Schneckentempo zur Schnellfahrstrecke". Süddeutsche Zeitung (in German). Retrieved 20 June 2020. https://www.sueddeutsche.de/bayern/augsburg-ulm-deutsche-bahn-ausbau-1.4652510

  18. Florian Fuchs and Claudia Henzler (24 October 2019). "Im Schneckentempo zur Schnellfahrstrecke". Süddeutsche Zeitung (in German). Retrieved 20 June 2020. https://www.sueddeutsche.de/bayern/augsburg-ulm-deutsche-bahn-ausbau-1.4652510

  19. "Neubaustrecke Wendlingen–Ulm". bahnprojekt-stuttgart-ulm.de. Retrieved 13 July 2024. https://www.bahnprojekt-stuttgart-ulm.de/projekt/ueberblick/neubaustrecke-wendlingen-ulm/

  20. "New Wendlingen-Ulm line: pacesetter for rail transport throughout Germany goes into operation". deutschebahn.com. 9 December 2022. Retrieved 13 July 2024. https://www.deutschebahn.com/en/presse/press_releases/New-Wendlingen-Ulm-line-pacesetter-for-rail-transport-throughout-Germany-goes-into-operation-9918718

  21. Florian Fuchs and Claudia Henzler (24 October 2019). "Im Schneckentempo zur Schnellfahrstrecke". Süddeutsche Zeitung (in German). Retrieved 20 June 2020. https://www.sueddeutsche.de/bayern/augsburg-ulm-deutsche-bahn-ausbau-1.4652510

  22. "ÖBB-Spatenstich: Weststrecke zwischen Linz und Marchtrenk wird viergleisig". Presseinfos - ÖBB (in German). Retrieved 13 July 2024. https://presse-oebb.at/news-oebb-spatenstich-weststrecke-zwischen-linz-und-marchtrenk-wird-viergleisig-?id=202014&menueid=27021&l=deutsch

  23. "Vier Gleise für ein Halleluja: Lückenschluss Weststrecke". Unsere ÖBB (in German). Retrieved 13 July 2024. https://www.unsereoebb.at/de/artikel/2021/lueckenschluss-weststrecke

  24. "Streckenausbau Wien − Bratislava. Bauabschnitt Niederösterreich". infrastruktur.oebb.at (in German). June 2020. Retrieved 13 July 2024. https://infrastruktur.oebb.at/de/projekte-fuer-oesterreich/bahnstrecken/weststrecke-wien-salzburg/ausbau-marchegger-ostbahn/rund-um-den-bau/printproduktionen-wbr/dokument?datei=Projektbrosch%C3%BCre+Ausbau+Wien-Bratislava%2C+Bauabschnitt+N%C3%96+%28Marchegger+Ostbahn%29

  25. "Marchegger Ostbahn schon 2025 zweigleisig". noe.ORF.at (in German). Retrieved 13 July 2024. https://noe.orf.at/stories/3104429//

  26. Šnídl, Vladimír. "Z Viedne do Bratislavy za 40 minút, sľubujú rakúske železnice. Slováci musia opraviť mosty z čias cisára Ferdinanda". Denník N (in Slovak). Retrieved 13 July 2024. https://dennikn.sk/1664629/z-viedne-do-bratislavy-za-40-minut-slubuju-rakuske-zeleznice-slovaci-musia-opravit-mosty-z-cias-cisara-ferdinanda/

  27. "Wien–Bratislava in 40 Minuten". bmvit INFOTHEK (in German). Retrieved 13 July 2024. https://infothek.bmk.gv.at/wien-bratislava-in-40-minuten/

  28. "Wien–Bratislava in 40 Minuten". bmvit INFOTHEK (in German). Retrieved 13 July 2024. https://infothek.bmk.gv.at/wien-bratislava-in-40-minuten/