Menu
Home Explore People Places Arts History Plants & Animals Science Life & Culture Technology
On this page
Route availability
System for grading the railway network of Great Britain

Route Availability (RA) is the system by which the permanent way and supporting works (bridges, embankments, etc.) of the railway network of Great Britain are graded. All routes are allocated an RA number between 1 and 10.

Rolling stock is also allocated an RA (again between 1 and 10) and the RA of a train is the highest RA of any of its elements. The train must have a route availability (RA) lower than or equal to the RA of a line to be allowed to use it. The RA is primarily related to the axle load of the vehicle, although axle spacing is also taken into consideration. In practice it is the locomotive which governs where trains may operate, although many high capacity 4 axle wagons have a high RA when fully loaded. (When considering the operation of trains the loading gauge must also be considered.)

The system was first devised by the London and North Eastern Railway, and perpetuated by British Rail to ascertain which locomotives can work on which lines throughout the rail network in Great Britain.

Exemptions may be obtained to allow locomotives to operate on lines from which they may otherwise be banned. An exemption might be granted by placing a speed restriction over a weak bridge, for example.

Related Image Collections Add Image
We don't have any YouTube videos related to Route availability yet.
We don't have any PDF documents related to Route availability yet.
We don't have any Books related to Route availability yet.
We don't have any archived web articles related to Route availability yet.

Line calculations

The route availability for a line is calculated by taking into account bridge strength, track condition, structural issues and so on. A route availability of one (RA1) is the most restricted line, open to possibly one type of locomotive specially designed for it. A route availability of 10 is the most open, usable by any locomotive that fits within the GB loading gauge that has been 'passed' for it (checked for conflicts with infrastructure such as platforms).

Vehicle calculations

Route availability for a vehicle (locomotive or wagon) is generally based upon its axle loading. That is, how much of the laden weight of the vehicle is distributed on each axle. The more weight on each axle, the higher the RA number, and the more restricted the vehicle is. For wagons it is normal to have different RAs when running empty and full.

The RA of a locomotive must not exceed the RA of the track except under strictly controlled circumstances.1

Thus a locomotive with RA 1 is able to work on any line, although it will have a very light axle loading. An RA 10 locomotive could only run on RA 10 lines, placing severe restrictions on where it can be used.

If a vehicle has wheels that require significant balance weights, often found on steam locomotives, the dynamic loading resulting in what is termed the hammer blow action may affect the RA of the vehicle.

Network Rail currently gives the allowed axle loadings as follows:23

Axle loading by Route Availability
Route AvailabilityAxle Load
RA3≤16.5 tonnes
RA5≤19.0 tonnes
RA6≤20.3 tonnes
RA8≤22.8 tonnes
RA9≤24.1 tonnes
RA10≤25.4 tonnes
EU average≈22.5 tonnes

Historical notes

Before nationalisation the Big Four railway companies had their own classification systems.

GWR's system for classification featured a coloured disc painted on the locomotive cab side to indicate its route availability:

GWR Route Availability4
Disc colourAxle load (long tons & cwt)Axle load (lb)Axle load (t)Notes
(no disc)up to 14 long tons 0 cwt31,400 lb14.2 t
Yellow disc14 long tons 0 cwt up to 16 long tons 0 cwt31,400–35,800 lb14.2–16.2 t
Blue discover 16 long tons 0 cwt, up to 17 long tons 12 cwt35,800–39,400 lb16.2–17.9 t
Red discover 17 long tons 12 cwt39,400 lb17.9 t
Double red disc22 long tons 10 cwt50,400 lb22.9 t"King" class only

See also

  • Ransome-Wallis, P. (1966). The Last Steam Locomotives of British Railways. Ian Allan Limited.

References

  1. Safety & Standards Directorate, Railtrack PLC (December 2000). "Interface between Rail Vehicle Weights and Underline Bridges - Appendix C - Flow chart of Procedure for Permitting a Train to Run" (PDF). Archived from the original (pdf) on 11 December 2007. Retrieved 17 August 2008. https://web.archive.org/web/20071211225925/http://www.rgsonline.co.uk/docushare/dsweb/Get/Rail-41549/GERT8006.pdf

  2. Network Rail Loading Gauge documentation https://web.archive.org/web/20070812111543/http://www.networkrail.co.uk/aspx/2230.aspx

  3. Network Rail Route Availability http://www.networkrail.co.uk/aspx/10551.aspx

  4. Ransome-Wallis (1966) p.181