Static load testing is an in situ type of load testing used in geotechnical investigation to determine the bearing capacity of deep foundations prior to the construction of a building. It differs from the statnamic load test and dynamic load testing in that the pressure applied to the pile is slower. Static load testings are performed in order to measure a design's axial tension or axial compression. It can also be used to measure its deflected shape under lateral load.

Related Image Collections Add Image
We don't have any YouTube videos related to Static load testing yet.
We don't have any PDF documents related to Static load testing yet.
We don't have any Books related to Static load testing yet.
We don't have any archived web articles related to Static load testing yet.

Kentledge load testing method

Kentledge refers to iron weights used as permanent ship ballast, or iron or concrete weights used in load testing. This method involves the construction of a platform upon which massive weights are placed. These weights bear down on the pile putting it under load. Gauges measure resistance, movement of the pile, and other readings to determine the properties of the ground.

Bi-Directional pile load testing method

Bi-Directional Static Load Test is a steadfast Maintained Load Test option for both large and small diameter piles that is widely used in the market. The main difference between a top-loaded maintained load test and a Bi-Directional is the location of the jack. One of the types of bi-directional method is YJACK method.4

Wikimedia Commons has media related to Static load testing.

References

  1. Handbook on Pile Load Testing, Federation of Piling Specialists, February 2006 http://www.fps.org.uk/fps/guidance/technical/piletesting/06-02-27%20load%20testing%20handbook%20(2006).pdf

  2. Static Pile Load Testing Manual, GCP-18, State of New York: Department of Transportation: Geotechnical Engineering Bureau, August 2015 https://www.dot.ny.gov/divisions/engineering/technical-services/technical-services-repository/GCP-18b.pdf

  3. "Pile Movement Analysis with Static Load Testing". GRL. Retrieved 2020-04-10. https://www.grlengineers.com/services/static-load-testing/

  4. State of the Art Technology of YJACK in Bidirectional Pile Test, Proceedings of International Conference Pile 2013, June 2–4, 2013 https://yjackpiletest.com/assets/files/State-Of-The-Art-TechnologyofYJACKinBi-DirectionalPileTest.pdf