Menu
Home Explore People Places Arts History Plants & Animals Science Life & Culture Technology
On this page
Green Line B branch
Boston Massachusetts subway line

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, B branch service runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

As of February 2023[update], service operates on 8-minute headways at weekday peak hours and 8- to 12-minute headways at other times, using 9 to 15 trains (18 to 30 light rail vehicles).

Related Image Collections Add Image
We don't have any YouTube videos related to Green Line B branch yet.
We don't have any PDF documents related to Green Line B branch yet.
We don't have any Books related to Green Line B branch yet.

History

Initial construction

The first sections of what is now the B branch to open were built for what became the Watertown Line and Beacon Street Line. In 1889, the West End Street Railway opened the Beacon Street Line, including a branch that ran from Coolidge Corner to Oak Square along Harvard Avenue, Brighton Avenue, Cambridge Street, and Washington Street.2: 58  While this route provided service to the fast-growing suburbs of Allston and Brighton, a more direct route was desirable. When Commonwealth Avenue was improved between Governors Square and the junction with Brighton Avenue in the mid-1890s, a 33-foot (10 m)-wide median was included for use by a streetcar line to support real estate development.3 Service began from Governors Square to Brighton Avenue, and along Brighton Avenue to connect with the older trackage at Union Square, on May 18, 1896.456: 48  (That line was extended to near Nonantum Square on June 13, 1896.)7: 48 

Further west, between Chestnut Hill Avenue and the Boston–Newton boundary at Lake Street, a 25-foot (7.6 m)-wide streetcar median was built.8 Service between Lake Street and downtown Boston began on August 15, 1896.9 Streetcars ran on Chestnut Hill Avenue, the existing Beacon Street line, Washington Street, and Huntington Avenue.10: 58  At Lake Street, the line connected with the Commonwealth Avenue Street Railway, which had opened to Auburndale on March 26, 1896.11: 38 

East of Governors Square, the Beacon Street line originally ran on Beacon Street, Massachusetts Avenue, and Boylston Street to Park Square.12: 54  By the time the Commonwealth Avenue segments opened, streetcars continued along heavily congested tracks on Tremont Street (electrified in 1891) to reach the northern railroad terminals.13: 61  Both the Nonantum Square and Lake Street lines were rerouted into the Tremont Street subway to terminate at Park Street station soon after the tunnel's September 1, 1897 opening.14: 21 

The Boston Elevated Railway (BERy) leased the West End Street Railway on October 1, 1897, and continued its system expansion.15: 35  The BERy opened new tracks on Commonwealth Avenue from Chestnut Hill Avenue to Brighton Avenue on May 26, 1900, allowing direct service from Lake Street to downtown via Commonwealth Avenue. Even though much of the land surrounding Commonwealth Avenue in Brighton was not yet developed, the new line was heavily patronized.16: 58  For most of its length, the 1900-built trackage was not in a center median, but in a reservation between the southbound travel lane and southbound carriage lane. Between Warren Street and Wallingford Road, the reservation was significantly wider than the tracks.17

Growing service

The Commonwealth Avenue Street Railway opened the popular Norumbega Park on June 17, 1897.18 (That line merged into the Newton and Boston Street Railway (N&B) in 1904 and the Middlesex and Boston Street Railway (M&B) in 1909.) Through service between Norumbega Park and Park Street station, operated by BERy east of Lake Street, begun on January 17, 1903.19: 39  The Newton Street Railway (also merged into the N&B in 1904) began through service between Park Street and Waltham via the Watertown Line on February 23, 1903. When the Cambridge Tunnel opened in April 1912, the Waltham service was rerouted to Central Square station in Cambridge instead.20: 39  On May 1, 1912, the M&B began a second through service over the Commonwealth Avenue route – this one running to Newton Highlands.21: 39  The next month, two men were charged with a planned "conspiracy to blow up the tracks of the Elevated Company in Commonwealth av" using ten sticks of stolen dynamite.22

The Boylston Street subway opened on October 3, 1914, acting as an extension of the Tremont Street subway to just east of Governors Square, with intermediate stops at Copley Square and Massachusetts Avenue.23: 40  (A third station, Arlington, was not built until 1921.) Lake Street service via Washington Street was cut back to Washington Square except at rush hours.24 The Newton Highlands through service was cut back to Lake Street, where it connected with BERy streetcar service.25: 39  Norumbega Park through service continued to use the surface route, as the older M&B streetcars could not match the speed of the newer BERy streetcars in the subway. It took was split at Lake Street on November 1, with a connecting BERy line using the surface route; that was cut to a Kenmore–Park Street route on November 21.26272829: 58 

On November 21, rush hour Washington Street service was cut back to Reservoir, leaving only Beacon Street cars using the Chestnut Hill Avenue tracks.30 Beacon Street service was cut to Reservoir on November 6, 1915, with Washington Street service extended back to Lake Street.31 Beginning on February 6, 1922, all Washington Street service was operated as a Brookline Village–Lake Street shuttle as part of service changes on the Huntington Avenue line.32 The Washington Street shuttle was converted to bus on April 24, 1926.33: 197  It was redirected to Brighton Center on June 23, 1928, and eventually became route 65.34: 52 35

The Commonwealth Avenue line served two major baseball stadiums: Fenway Park (opened 1912) near Governors Square, and Braves Field (opened 1915) in Allston. The BERy opened a prepayment surface station (where riders paid their fares at the stop, rather than on board the streetcar) at Kenmore Street in Governors Square in 1915.36: 58  The new Braves Field opened on August 18, 1915; it included a loop track between Gaffney Street and Babcock Street with a prepayment station to allow streetcars to directly serve the ballpark.37 The loop was also used to turn trains for Red Sox games at Fenway Park, and for rush-hour short turns; after November 1945, these short turns also operated during midday and on Saturdays.38: 108  The loop was heavily used during games; for the 1948 World Series, streetcars ran between Park Street and Braves Field on 45-second headways.39: 109 

Further changes

Around 1916, the BERy built a storage yard for streetcars north of Commonwealth Avenue at Lake Street.404142 Remaining M&B service to Lake Street was replaced by buses in 1930; the BERy replaced the old transfer station in the median with a new platform and waiting room in the yard on September 12, 1930.43: 59  An expansion of Reservoir Yard (south of Beacon Street near Chestnut Hill Avenue), completed in May 1940, supplemented Lake Street Yard and eliminated the need to base some Commonwealth Avenue streetcars at Bennett Street Carhouse in Cambridge.44: 102 

In June 1922, the BERy proposed to operate the inner part of the Commonwealth Avenue line as a rapid transit service. Three-car trains of recently acquired center-entrance cars, which had higher capacity and shorter dwell times than older streetcars, would run on headways as low as two minutes at rush hour and four minutes at other times.4546: 59  A terminal stations would be built at Linden Street (near Harvard Avenue) in Allston, where passengers would transfer between the subway trains and surface streetcar lines.47 The Lechmere Square in East Cambridge (already under construction) opened that July, but local opposition to the forced transfer caused the Linden Street terminal plan to be scrapped.48: 59 

The congestion at busy Governors Square caused numerous delays to the streetcar lines. In May 1924, the state legislature directed the Metropolitan District Commission to plan an expanded rapid transit system in Boston, including an extension of the Boylston street Subway under Governors Square.49 The report, released in December 1926, called for the existing streetcar tunnels in Boston to be reorganized into two rapid transit lines with high-floor rolling stock.50 One line was to run from East Boston to Brighton, with the East Boston Tunnel (which had been converted from streetcars to rapid transit in 1924) realigned to connect with the Tremont Street subway near Park Street station. The Boylston Street subway would have been extended to Commonwealth Avenue, with a new station under Governors Square. A transfer station between the rapid transit line and the truncated Watertown and Lake Street surface lines was to be located at Warren Street between Commonwealth Avenue and Cambridge Street, near Brighton Center.51: 5  Intermediate surface stops were to be located at Saint Mary's Street, Gaffney Street, Packards Corner, Harvard Avenue, and Allston Street.52: VI  Several busy grade crossings also were to be eliminated, and the report noted that the then-rapid growth along Commonwealth Avenue in Brighton might later justify extension of rapid transit to Lake Street.53: 32 

The subway under Governors Square was projected to cost $5 million (equivalent to $89 million in 2024). The BERy and the city objected to this cost and proposed a $1.4 million plan where flyover ramps would separate Beacon Street auto and streetcar traffic from other traffic in the square.54 The tunnel was eventually chosen but construction did not begin until 1930, after the legislature lowered the cost that the BERy would pay to rent the subway from the city.55 Kenmore station and the new subway, which split to separate portals at Saint Mary's Street on Beacon Street and Blandford Street on Commonwealth Avenue, opened on October 23, 1932.5657: 59  The extension was built to support future rapid transit conversion of the Commonwealth Avenue line, including extension of the underground section further west.5859: 44 

Interest in converting the Commonwealth Avenue line to rapid transit declined as focus shifted to expanding the subway to further suburbs. The 1945 and 1947 Coolidge Commission reports (the next major planning effort after the 1926 report) instead recommended a parallel rapid transit line along the Boston and Albany Railroad corridor, with local streetcar service retained on Commonwealth Avenue.6061: 16  However, several smaller improvements were made to the line. A siding was opened at Washington Street on October 27, 1926, allowing trains to be short turned when necessary.62: 59  On February 7, 1931, the Beacon Street and Commonwealth Avenue lines were extended to Lechmere, replacing shuttle services between Lechmere and various points in the subway.6364 On June 30, 1931, the existing crossover west of Blandford Street was replaced by a pocket track, allowing temporary storage of streetcars there. It replaced the former surface cutback at Kenmore for subway short turns, which began on September 24, 1934.65: 59  Around 1940, the Lake Street line was assigned route number 62 as part of a systemwide renumbering.66: 27  On May 6, 1940, the line was reassigned from Bennett Street Carhouse (near Harvard Square) to Reservoir Carhouse, eliminating the need for deadhead moves on Cambridge Street.67: 115 

Postwar years

In the early 1940s, the BERy began replacing its older streetcars with the PCC streetcar. PCCs were first used on the Lake Street line in May 1944, and they fully replaced center-entrance cars on the line in regular service on December 10, 1945.68: 100  The short length of trackage on Chestnut Hill Avenue – which had not been used in revenue service since 1926 – was modified as part of trackwork related to the introduction of the PCCs. A connecting track from Commonwealth Avenue westbound to Chestnut Hill Avenue southbound was opened on May 31, 1947, completing the wye between the two avenues.69: 102  On May 21, 1947, in recognition of the expansion of Boston College, the BERy changed the "Lake Street" designation to "Boston College".70: 99  On August 29, 1947, the privately owned BERy was succeeded by the publicly owned Metropolitan Transit Authority (MTA).71: 17 

The little-used siding at Washington Street was removed in January 1953, leaving only a crossover.72: 202  In April 1959, all Boston and Albany Railroad Worcester Line stops between Back Bay and Newtonville were closed for the construction of the Turnpike Extension, leaving the Watertown and Boston College lines as the only rail transit serving Allston and Brighton.73 Boston University purchased Braves Field in 1953 when the Braves moved to Milwaukee, and soon wished to use the loop area for other purposes. After several years of requests, the MTA abandoned the loop on January 15, 1962.74: 214 

In 1960, the wide streetcar reservation between Warren Street and Wallingford Road was narrowed to add additional travel lanes to Commonwealth Avenue, leaving the streetcar tracks in a relocated median between the travel lanes.7576: 45  On November 25, 1961, the Boston College was cut back to Park Street station, while the 1959-opened Riverside Line was extended to Lechmere in its stead.77: 203  In 1963–65, the Commonwealth Avenue bridge over the Boston and Albany Railroad was rebuilt to accommodate the Turnpike Extension. Streetcar service was maintained using a temporary parallel bridge.7879: 203 

MBTA era

In August 1964, the Massachusetts Bay Transportation Authority (MBTA) replaced the MTA. As part of systemwide rebranding efforts, the remaining streetcar routes feeding the Tremont Street subway became the Green Line on August 26, 1965.80 In 1967, the five branches were given letters to distinguish them; the Boston College line became the B branch. (The Watertown line became the A branch, while the Beacon Street line became the C branch.)81 The MBTA experimented with changing the downtown terminals of the Green Line branches (unlike its predecessors, which had changed the downtown terminal of the Boston College line just twice.) The B branch was extended to the new loop at Government Center opened on November 18, 1964 – the first service to regularly use the loop.82 Over the next two decades, the downtown termini were frequently changed; the B branch variously terminated at Park Street, Government Center, Haymarket, North Station, and Lechmere. On July 30, 1983, the terminus was finally changed to Government Center station, where it would stay until 2004.83

On June 21, 1969, the A branch was replaced with Watertown–Kenmore buses, halving streetcar service on Commonwealth Avenue east of Packard's Corner.8485: 48  In 1970, the median was moved slightly south between Chestnut Hill Avenue and Lake Street.8687 The westbound roadway was lowered several feet below the median between South Street and Greycliff Road, with the Foster Street stop moved 500 feet (150 m) west to the Greycliff Road grade crossing.88 Around 1975, the stop at University Road was discontinued, while the stop at Alcorn Street was moved 500 feet east to Babcock Street.89

The downtown terminus was extended to North Station on June 25, 2004, but cut back to Government Center on January 1, 2005. It was cut back further to Park Street on March 22, 2014, when Government Center closed for reconstruction. When the station reopened in 2016, Park Street remained the B branch terminus.90 The B branch was re-extended to Government Center on October 24, 2021, as part of changes in preparation for the opening of the Green Line Extension the next year.91 The B branch extension was intended to improve access to the Blue Line and better distribute downtown service.92 B branch service was replaced by buses from June 20 to July 1, 2022, to allow for trackwork and installation of train protection system equipment.93

Accessibility and stop consolidation

The introduction of low-floor LRVs in 2000 allowed for accessible service on the Green Line. In the early 2000s, the MBTA modified key surface stops with raised platforms as part of the Light Rail Accessibility Program. Portable lifts were installed at Boston College and Boston University Central around 2000.9495 Four surface stops – Boston University East, Boston University Central, Harvard Avenue, and Washington Street – were modified with raised platforms in 2002–03; Boston College was similarly modified in 2009.9697

The B branch is frequently criticized by riders for its slow service, with a high number of stops and level crossings. Until 2004, the line had 22 stops on the surface section, while the C and D branches had 13 each and the E branch just 9.98 In late 2003, the MBTA proposed eliminating five surface stops (Greycliff Road, Chiswick Road, Mount Hood Road, Summit Avenue, and Fordham Road) as part of a project to improve the line. The five stops were chosen because they had low ridership and were located very close to other stations.99 After a public comment period, Chiswick Road was removed from the proposal, as it served a nearby elderly housing community.100 On April 20, 2004, the other four stops were closed as a 6-to-8-month pilot program.101 On March 15, 2005, after a survey showed that 73% of 1,142 riders surveyed approved of the closures, the MBTA board voted to make the closures permanent.102

In 2014, the MBTA began planning to consolidate four stops – Boston University West, Saint Paul Street, Pleasant Street, and Babcock Street – located near Boston University's West Campus.103104 The four stops, which were not accessible, were replaced by two fully accessible stops as part of a reconstruction of Commonwealth Avenue between the BU Bridge and Packard's Corner. The MBTA awarded a $17.8 million construction contract on March 23, 2020.105 Construction was to last from February 2021 to early 2022, with night and weekend bustitution for much of 2021.106 Stop names of "Babcock Street" and "Amory Street" were announced in February 2021.107 Buses replaced rail service between Washington Street and Kenmore from April 17–May 9 and May 17–June 13, 2021, for construction of the platforms and canopy steelwork.108109 Track replacement was also conducted between Blandford Street and BU Central during the closure.110 The two new stations, Babcock Street and Amory Street, opened on November 15, 2021.111

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.112 Design work for Packards Corner, Sutherland Road, Chiswick Road, Chestnut Hill Avenue, and South Street was 30% complete by December 2022.113 Designs shown in March 2024 called for Chestnut Hill Avenue station and South Street station to be consolidated into a single station as part of the project.114 In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at the 14 B and C branch stops.115 Five stations not originally included in the project were added in 2024: Blandford Street will be closed, Griggs Street rebuilt, Allston Street and Warren Street consolidated into a single station, and Boston College relocated.116117 As of February 2025[update], the MBTA plans to advertise the $74 million design-build contract for bidding in May 2025.118 Construction is expected to take place from fall 2025 to mid-2027.119

In 2021, the MBTA indicated that a longer-term project may replace side platforms with wider island platforms at some or all surface stops.120 That full project of station consolidation and renovations, as well as track realignment and traction power improvements, is expected to cost $221 million.121: 47  A reconstruction and expansion of Lake Street Yard to support new Type 10 LRVs is planned for the late 2020s.122: 66 123

Station listing

LocationStationOpenedNotes and connections
East Cambridge LechmereMarch 21, 2022Original surface station was open from July 10, 1922 to May 23, 2020; it had not served the B branch since March 21, 1980. Current station for D and E branches.
West End Science ParkAugust 20, 1955Current station for D and E branches; has not served B branch since March 21, 1980.
North End North StationJune 28, 2004Current station for D and E branches; has not served B branch since December 31, 2004
HaymarketSeptember 3, 1898Current station for D and E branches; has not served B branch since December 31, 2004
DowntownBoston Government Center MBTA subway: Blue Line MBTA bus: 354
Park StreetSeptember 1, 1897 MBTA subway: Red Line, Silver Line (SL5) MBTA bus: 43At Downtown Crossing: Orange Line; 7, 11, 501, 504505
Boylston MBTA subway: Silver Line (SL5) MBTA bus: 43
Back Bay ArlingtonNovember 13, 1921 MBTA bus: 9, 501504
CopleyOctober 3, 1914 MBTA bus: 9, 10, 39, 55, 501504
Hynes Convention Center MBTA bus: 155
Fenway–Kenmore KenmoreOctober 23, 1932 MBTA bus: 8, 19, 57, 6065At Lansdowne: Framingham/​Worcester Line
Boston UniversityBlandford Streetc. 1894 MBTA bus: 57
Boston University East MBTA bus: 57
Boston University Central MBTA bus: 47, 57CT2
University RoadClosed c. 1975
Amory StreetNovember 15, 2021 MBTA bus: 57
Allston Babcock Street MBTA bus: 57
Packards Cornerc. 1895 MBTA bus: 57
Fordham RoadMay 26, 1900Closed April 20, 2004
Harvard Avenue MBTA bus: 66
Griggs Street
Allston Street
BrightonWarren Street
Summit AvenueClosed April 20, 2004
Washington Street MBTA bus: 65
Mount Hood RoadClosed April 20, 2004
Sutherland Road
Leamington RoadClosed June 21, 1980
Chiswick Road
Chestnut Hill AvenueAugust 15, 1896 MBTA bus: 86
South Street
Greycliff Roadc. 1970Moved from Foster Street around 1970; closed April 20, 2004
Brighton/Newton Boston CollegeAugust 15, 1896
Wikimedia Commons has media related to Green Line B branch. Template:Attached KML/Green Line B branchKML is from Wikidata

References

  1. Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 10. /wiki/Boston_Street_Railway_Association

  2. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  3. Annual Report of City Engineer (28 ed.). 1895. pp. 131–137. https://books.google.com/books?id=lxZbAAAAYAAJ&pg=PA131

  4. Ninth Annual Report of the West End Street Railway Company for the Year Ending September 30, 1896. Walker, Young & Co. 1896. p. 5 – via Internet Archive. https://archive.org/stream/annualreporto18831921west#page/n225/mode/2up

  5. "New Electric Line". Boston Globe – via Newspapers.com. https://www.newspapers.com/clip/59417143/the-boston-globe/

  6. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  7. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  8. Annual Report of City Engineer (28 ed.). 1895. pp. 131–137. https://books.google.com/books?id=lxZbAAAAYAAJ&pg=PA131

  9. "Newton". Boston Globe. August 15, 1896. p. 3 – via Newspapers.com. https://www.newspapers.com/clip/53147423/the-boston-globe/

  10. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  11. "Commonwealth Av. Street Railway Company". Boston Globe. March 27, 1896. p. 5 – via Newspapers.com. https://www.newspapers.com/clip/52816026/the-boston-globe/

  12. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  13. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  14. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  15. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  16. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  17. "Atlas of the City of Boston: Ward 25, Brighton". G.W. Bromley and Co. 1909 – via Ward Maps. https://www.wardmaps.com/viewasset.php?aid=8481

  18. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  19. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  20. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  21. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  22. Durso, Holly Bellocchio (June 2011). Subway Spaces as Public Places: Politics and Perceptions of Boston's T (MCP). Massachusetts Institute of Technology. p. 136. hdl:1721.1/66801. https://dspace.mit.edu/handle/1721.1/66801

  23. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  24. "Changes Made by New Subway". Boston Globe. October 1, 1914. p. 3 – via Newspapers.com. https://www.newspapers.com/clip/54438602/the-boston-globe/

  25. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  26. "Changes Made by New Subway". Boston Globe. October 1, 1914. p. 3 – via Newspapers.com. https://www.newspapers.com/clip/54438602/the-boston-globe/

  27. "Some of Old Lines are Discontinued". Boston Globe. November 20, 1914. p. 11 – via Newspapers.com. https://www.newspapers.com/clip/54438561/the-boston-globe/

  28. "Newton". Boston Globe. October 28, 1914. p. 8 – via Newspapers.com. https://www.newspapers.com/clip/54438663/the-boston-globe/

  29. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  30. "Some of Old Lines are Discontinued". Boston Globe. November 20, 1914. p. 11 – via Newspapers.com. https://www.newspapers.com/clip/54438561/the-boston-globe/

  31. "Lake St and Reservoir Car Changes". Boston Globe. November 6, 1915. p. 10 – via Newspapers.com. https://www.newspapers.com/clip/54438577/the-boston-globe/

  32. "New 2-Car Trains on Huntington Av Feb 6". Boston Globe. January 24, 1922. p. 18 – via Newspapers.com. https://www.newspapers.com/clip/52878704/the-boston-globe/

  33. Humphrey, Thomas J. (August 2020). "Origin and Development of the Fixed-Route Local Bus Transportation Network in the Cities and Towns of the Massachusetts Bay Transportation Authority District as of December 31, 1973: Revised Edition" (PDF). NETransit. http://www.transithistory.org/roster/MBTABUSDEV.pdf

  34. Humphrey, Thomas J. (August 2020). "Origin and Development of the Fixed-Route Local Bus Transportation Network in the Cities and Towns of the Massachusetts Bay Transportation Authority District as of December 31, 1973: Revised Edition" (PDF). NETransit. http://www.transithistory.org/roster/MBTABUSDEV.pdf

  35. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  36. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  37. "Handling Traffic at Largest Baseball Park". Electric Railway Journal. Vol. 46, no. 13. September 25, 1915. p. 621 – via Internet Archive. https://archive.org/stream/electricrailway461915newy#page/620/mode/2up

  38. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  39. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  40. "Sheet 10". Track Lengths of Surface Lines and Subway. Boston Elevated Railway. 1921 – via Ward Maps. http://www.wardmaps.com/viewasset.php?aid=15926

  41. "Part of Ward 6, City of Newton". Atlas of the City of Newton, Massachusetts. G.W. Bromley and Company. 1917 – via Ward Maps. http://www.wardmaps.com/viewasset.php?aid=1783

  42. "Part of Brighton, Ward 25, City of Boston". Atlas of the City of Boston, Wards 25 & 26, Brighton. G.W. Bromley and Company. 1916 – via Ward Maps. http://www.wardmaps.com/viewasset.php?aid=1051

  43. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  44. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  45. "New Prepayment Station in Boston". Electric Railway Journal. Vol. 59, no. 23. June 10, 1922. p. 951. https://books.google.com/books?id=ZF8_AQAAMAAJ&pg=PA951

  46. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  47. "New Prepayment Station in Boston". Electric Railway Journal. Vol. 59, no. 23. June 10, 1922. p. 951. https://books.google.com/books?id=ZF8_AQAAMAAJ&pg=PA951

  48. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  49. "Chapter 45: Resolve providing for an investigation by the Division of Metropolitan Planning relative to the extension and development of rapid transit service in Boston, Somerville and surrounding cities and towns". Acts and resolves passed by the General Court of Massachusetts in the year 1924. May 24, 1924. pp. 602–603 – via Internet Archive. https://archive.org/details/actsresolvespass1924mass

  50. Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689. /wiki/Hdl_(identifier)

  51. Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689. /wiki/Hdl_(identifier)

  52. Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689. /wiki/Hdl_(identifier)

  53. Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689. /wiki/Hdl_(identifier)

  54. "Planning Board Agrees with Boston Elevated". Electric Railway Journal. Vol. 68, no. 20. November 13, 1926. p. 899. https://archive.org/stream/electricrailwayj68mcgrrich#page/898/mode/2up

  55. Annual Report of the Transit Department of the City of Boston. Boston Transit Department. 1930. pp. 1–4 – via Internet Archive. https://archive.org/details/annualreport1930trans

  56. Annual report of the public trustees of the Boston Elevated Railway (14 ed.). Boston Elevated Railway. p. 14 – via Internet Archive. https://archive.org/details/annualreportofpu32bost

  57. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  58. Annual Report of the Transit Department of the City of Boston. Boston Transit Department. 1930. pp. 1–4 – via Internet Archive. https://archive.org/details/annualreport1930trans

  59. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  60. Boston Elevated Railway; Massachusetts Department of Public Utilities (April 1945), Air View: Present Rapid Transit System – Boston Elevated Railway and Proposed Extensions of Rapid Transit into Suburban Boston – via Wikimedia Commons https://commons.wikimedia.org/wiki/File:1945_BERy_extensions_map.jpg

  61. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  62. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  63. Chasson, George Jr. (1987). Lonto, Arthur J. (ed.). "Boston's Main Line El: The Formative Years 1879-1908". Headlights. 49. Electric Railroader's Association: 25–26.

  64. "Lake St, Reservoir, to Lechmere trains". Boston Globe. February 5, 1931. p. 7 – via Newspapers.com. https://www.newspapers.com/clip/38891556/the_boston_globe/

  65. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  66. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  67. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  68. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  69. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  70. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  71. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN 0938315056. 0938315056

  72. Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN 9780938315070. 9780938315070

  73. Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. p. 24. ISBN 9780685412947. 9780685412947

  74. Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN 9780938315070. 9780938315070

  75. Keblinsky, Joseph A. (September 1, 1960). "Commonwealth Avenue Gets a Face-Lifting Job". Boston Globe. p. 9 – via Newspapers.com. https://www.newspapers.com/clip/52690609/the-boston-globe/

  76. Sindel, David A. (June 2017). Strategies for meeting future capacity needs on the light rail MBTA Green Line (Thesis). Massachusetts Institute of Technology. hdl:1721.1/111263. /wiki/Hdl_(identifier)

  77. Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN 9780938315070. 9780938315070

  78. "Commonwealth Avenue Bridge Replacement". Rollsign. Vol. 54, no. 7/8. Boston Street Railway Association. July–August 2017. p. 11.

  79. Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN 9780938315070. 9780938315070

  80. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  81. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  82. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  83. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  84. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  85. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048. 0938315048

  86. "Ask the Globe". Boston Globe. February 18, 1970. p. 2 – via Newspapers.com. https://www.newspapers.com/clip/52690767/the-boston-globe/

  87. Rosa, Francis (April 17, 1970). "Korea's Kim looms challenge in Marathon". Boston Globe. p. 29 – via Newspapers.com. https://www.newspapers.com/clip/52690803/the-boston-globe/

  88. Sindel, David A. (June 2017). Strategies for meeting future capacity needs on the light rail MBTA Green Line (Thesis). Massachusetts Institute of Technology. hdl:1721.1/111263. /wiki/Hdl_(identifier)

  89. Sindel, David A. (June 2017). Strategies for meeting future capacity needs on the light rail MBTA Green Line (Thesis). Massachusetts Institute of Technology. hdl:1721.1/111263. /wiki/Hdl_(identifier)

  90. Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. http://roster.transithistory.org/MBTARouteHistory.pdf

  91. "Alerts: Subway". Massachusetts Bay Transportation Authority. October 14, 2021. Archived from the original on October 14, 2021. https://web.archive.org/web/20211014192326/https://www.mbta.com/alerts/subway

  92. DeCosta-Klipa, Nik (October 22, 2021). "A 'subtle' but permanent change is coming to the Green Line this weekend". Boston Globe. Retrieved October 24, 2021. https://www.boston.com/news/local-news/2021/10/22/green-line-terminal-station-changes-glx-testing/

  93. "Work to Accelerate Green Line Safety Improvements Begins Monday" (Press release). Massachusetts Bay Transportation Authority. June 16, 2022. https://www.mbta.com/news/2022-06-16/work-accelerate-green-line-safety-improvements-begins-monday

  94. "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. p. 2-9. Archived from the original (PDF) on February 20, 2012. https://web.archive.org/web/20120220063458/http://www.bostonmpo.org/bostonmpo/pmt-old/PMT-1.pdf

  95. "Subway Map" (PDF). Massachusetts Bay Transportation Authority. 2001. Archived from the original (PDF) on July 1, 2001. https://web.archive.org/web/20010701041753/http://www.mbta.com/text-only/schedmaps/map/map.pdf

  96. Rocheleau, Matt (28 September 2012). "MBTA to hold meeting on $20m project to rebuild Boston College Station". Boston Globe. Archived from the original on October 1, 2012. https://web.archive.org/web/20121001202632/http://www.boston.com/yourtown/news/allston_brighton/2012/09/mbta_to_hold_meeting_on_20m_pr.html

  97. "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. p. 2-9. Archived from the original (PDF) on February 20, 2012. https://web.archive.org/web/20120220063458/http://www.bostonmpo.org/bostonmpo/pmt-old/PMT-1.pdf

  98. "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on November 26, 2010. https://web.archive.org/web/20101126012518/http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0504.pdf

  99. Daniel, Mac (March 16, 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on March 18, 2005. https://web.archive.org/web/20050318030644/http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey/

  100. Daniel, Mac (March 16, 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on March 18, 2005. https://web.archive.org/web/20050318030644/http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey/

  101. "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on November 26, 2010. https://web.archive.org/web/20101126012518/http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0504.pdf

  102. Daniel, Mac (March 16, 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on March 18, 2005. https://web.archive.org/web/20050318030644/http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey/

  103. "Comm. Ave. Green Line Improvements Public Meeting" (Press release). Massachusetts Bay Transportation Authority. October 16, 2014. https://www.mbta.com/news/2014-10-16/comm-ave-green-line-improvements-public-meeting

  104. O'Rourke, John (October 23, 2014). "T May Eliminate Two Green Line B Stops". BU Today. Retrieved October 31, 2014. http://www.bu.edu/today/2014/t-may-eliminate-two-green-line-b-stops/

  105. "FMCB Awards $17.8 Million for B Branch Station Consolidation Work" (Press release). Massachusetts Bay Transportation Authority. March 23, 2020. https://mbta.com/news/2020-03-23/fmcb-awards-178-million-b-branch-station-consolidation-work

  106. "B Branch Station Consolidation Project: Virtual Public Meeting" (PDF). Massachusetts Bay Transportation Authority. January 28, 2021. https://cdn.mbta.com/sites/default/files/2021-01/2021-01-28-glt-b-branch-station-consolidation-meeting-presentation.pdf

  107. "MBTA Announces Names of New Stations as Part of Green Line B Branch Station Consolidation Project" (Press release). Massachusetts Bay Transportation Authority. February 11, 2021. https://www.mbta.com/news/2021-02-11/mbta-announces-names-new-stations-part-green-line-b-branch-station-consolidation

  108. "Building a Better T: Green Line B Branch Station Consolidation Project Work Taking Place for Seven Weeks, Washington Street – Kenmore Work Begins April 17" (Press release). Massachusetts Bay Transportation Authority. March 31, 2021. https://www.mbta.com/news/2021-03-31/building-better-t-green-line-b-branch-station-consolidation-project-work-taking

  109. "B Branch Accelerated Work 100% Complete" (Press release). Massachusetts Bay Transportation Authority. June 14, 2021. https://www.mbta.com/projects/green-line-b-branch-station-consolidation/update/b-branch-accelerated-work-100-complete

  110. "Report from the General Manager" (PDF). Massachusetts Bay Transportation Authority. April 26, 2021. p. 11. https://cdn.mbta.com/sites/default/files/2021-04/2021-04-26-fmcb-2-report-from-general-manager.pdf

  111. "New Babcock Street and Amory Street Stations Open November 15" (Press release). Massachusetts Bay Transportation Authority. November 12, 2021. https://www.mbta.com/projects/green-line-b-branch-station-consolidation/update/new-babcock-street-and-amory-street

  112. Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5. https://cdn.mbta.com/sites/default/files/2021-05/2021-05-28-swa-initiatives-accessible.pdf

  113. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5. https://cdn.mbta.com/sites/default/files/2022-12/2022-12-7-swa-initiatives-report-december-accessible.pdf

  114. "Green Line B Branch Improvements and Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. March 22, 2024. https://cdn.mbta.com/sites/default/files/2024-04/03-22-2024-green-line-b-branch-accessibility-upgrades.pdf

  115. "All Stations Accessibility Program FY24 Projects". Federal Transit Administration. May 28, 2024."Biden-Harris Administration Announces $343 Million to Modernize Transit Stations, Improve Accessibility Across the Country" (Press release). Federal Transit Administration. May 28, 2024."MBTA Wins $67 Million Federal Grant to Improve Green Line Accessibility for People with Disabilities" (Press release). Massachusetts Bay Transportation Authority. May 30, 2024. https://www.transit.dot.gov/funding/grants/grant-programs/all-stations-accessibility-program-fy24-projects

  116. "Accessibility Initiatives—December 2024" (PDF). Massachusetts Bay Transportation Authority. December 6, 2024. pp. 4–5. https://cdn.mbta.com/sites/default/files/2024-12/2024-12-06-accessibility-initiatives.pdf

  117. "Outreach Meeting for A26CN05 – Design Build Green Line B Branch Short Term Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority. November 12, 2024. https://bc.mbta.com/business_center/bidding_solicitations/pdf/DB%20Outreach%20Meeting%20A26CN05%20%20DB%20Green%20Line%20B%20Branch%20Short%20Term%20Accessibility%20Improvements.pdf

  118. "Upcoming Design Build and Construction Manager At Risk Solicitations". Massachusetts Bay Transportation Authority. February 2025. Archived from the original on February 21, 2025. https://web.archive.org/web/20250221000332/https://bc.mbta.com/business_center/bidding_solicitations/future_db_and_cmar_solicitations/

  119. "Accessibility Initiatives—December 2024" (PDF). Massachusetts Bay Transportation Authority. December 6, 2024. pp. 4–5. https://cdn.mbta.com/sites/default/files/2024-12/2024-12-06-accessibility-initiatives.pdf

  120. Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7. https://cdn.mbta.com/sites/default/files/2021-06/2021-06-21-fmcb-15-green-line-transformation-update.pdf

  121. "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. pp. 47, 66, 78. https://cdn.mbta.com/sites/default/files/2022-03/2022-03-24-proposed-fy23-27-mbta-cip-2.pdf

  122. "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. pp. 47, 66, 78. https://cdn.mbta.com/sites/default/files/2022-03/2022-03-24-proposed-fy23-27-mbta-cip-2.pdf

  123. "Green Line B Branch Improvements and Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. March 22, 2024. https://cdn.mbta.com/sites/default/files/2024-04/03-22-2024-green-line-b-branch-accessibility-upgrades.pdf